15,607 drawing Home Design Photos

Glenvale Kitchens
Shaker Grey
Ideabooks220K
Questions41
What cabinet company makes draws like these? Thanks.
Corner kitchen draw design
The draws...Corner drawes...Corner draws
“lazy sussan” — wontingchiu
William Reue Architecture
A House in the Woods
Ideabooks2,230
Questions5
to follow. Project communication relies heavily on 2-D drawings, which are a challenge to decipher for most clients. Your team has learned over time how to read drawings and understand the implications of changing plans. Moving walls on a drawing seems simple enough, but there could be structural, electrical
“Bathroom 6” — visionaryvanguard
Paxton Gate
1 Review
Residential Garden
Ideabooks3,384
Questions1
3. Draw your plans. Once you've decided which elements you want to include, and have a better idea of how to utilize your space, draw it out on paper. When you have an accurate (and to-scale) drawing of how things will be laid out, it'll be much easier for you (or anyone you work with) to make sure
“The wicker chairs” — jbrianm
J. Hirsch Interior Design, LLC
1 Review
J. Hirsch Interior Design Portfolio
Ideabooks14,223
Questions23
3. Develop plans, elevations and 3-D drawings. Now that you've got a plan you love, let your designer really detail it out. Drawings will help you visualize what the cabinetry will look like. Note on the plans and drawings where spices, pots and pans, silverware and utensils will go. At this stage, it's
“Paint color” — rafunderburk
Swatt | Miers Architects
5 Reviews
OZ House
Ideabooks5,969
Questions5
built corresponds with the drawings. It is the contractor who coordinates these inspections, and who needs to plan for them so work doesn’t stop while everyone waits for an inspection to happen. If the inspector feels there is a gap between what has been documented in the drawings and what is being built
built, he or she can request more information from the team. This is to understand that the changes from what is documented in the drawings will still satisfy the building code. Or worse, the inspector can place a stop-work order, which effectively shuts down the project. And that can put your timeline on
“Floor” — loriane
Buckminster Green LLC
9 Reviews
Kitchen Backsplash
Ideabooks69,013
Questions43
prepare final floor plans, elevations, details and, if applicable, mechanical and electrical drawings, lighting switch plans, and exterior elevations.This is where your final permit set or Construction Drawings (CDs) come into play. It's important to have finishes and fixtures selected at this time, since
since this is what will be considered in the final pricing from the contractor. You'll submit drawings for permits. These have a lead time, so check the timing with your local village. You'll need an architect, designer or licensed contractor signed up to finalize the paperwork and pick up your permits
“Island top” — jamiedunne
Powell/Kleinschmidt, Inc.
Florida Residence
Ideabooks1,673
Questions0
drawing on the wall
Sharpie- drawing on the wall!
Simple drawing on white
Drawing large
“Ok” — sergey55
ibrahim radwan
utopia projects
Ideabooks734
Questions1
Drawing room
Drawing room design idea
False ceiling for drawing room
“Lounge” — sam2811
© 2014 Houzz Inc.
Houzz® The new way to design your home™