This is another project by Willig. "I like to interject a little midcentury-modern asymmetry into the design and then let the kids tell me what they want in the way of features — for example, a fireman’s pole, pirate flag, zip line, net, trap doors, et cetera." This multilevel treehouse took longer to build than the previous one, requiring about 10 days of labor by three workers.