Emily Hurley I just dug through the previous questions on this one. Looks like the counters are honed Seagrass Limestone.
About the color and finish of the cabinets, she said, "the range and sink cabinets are Benjamin Moore Decorator White and the floor to ceiling REF wall is Benjamin Moore Grant Beige. Note: both colors were made into a "conversion varnish" to ensure a super hard, durable finish."
Once the templating is done, you'll usually have to wait one to two weeks for your countertops to be fabricated. Make sure you get a firm date from your installer, because you'll want to schedule your plumber for right after the counters are installed. The sink will be clamped and siliconed in place, and the faucet holes drilled, on install day, but your plumber will need to hook up the faucet and drain before you can use it. Silicone and the epoxy used to seam materials together give off powerful fumes, so make sure the room is well ventilated that day.
Breezy kitchen with original look from tiles and freestanding island, metal in stool and pot rack look fantastic. Would place stove in front of window instead of sin, though. Might add a brighter colour than the island, change the metal pulls to copper and make the floors terracotta.