Louise Lakier From Gay: "Yes….all of the paint used was purchased from Daly’s.
Remember, this was done 8 years ago.
Not sure they’d even carry the same colors.
Some were standard….some mixed.
All took a very long time to come together."
http://www.dalyspaint.com/
The remodeling team removed an entry cabinet blocking the view, reconfigured the stairs and shifted the front door to align better with the entry walkway. Spicuzza designed and installed the lighting using copper pipe so that it disappears against the wood ceiling from Pacific Iron & Metal. LL: What is your next home project? GS: No new ones, thank you ... just to finish the existing ones. Both decks, for sure, are first.TK: Yes, the next home project is to complete the new deck rail on the upper deck.
The remodeling team removed an entry cabinet blocking the view, reconfigured the stairs and shifted the front door to align better with the entry walkway. Spicuzza designed and installed the lighting using copper pipe so that it disappears against the wood ceiling from Pacific Iron & Metal.
The remodeling team removed an entry cabinet blocking the view, reconfigured the stairs and shifted the front door to align better with the entry walkway. Spicuzza designed and installed the lighting using copper pipe so that it disappears against the wood ceiling from Pacific Iron & Metal.
They were found @a garage sale in the neighborhood."