Kenny Craft, CNU LEED AP The booth was made by (Booths-forU) (http://www.boothsforu.com/). It cost about $3,000. the freight was in addition to this about about $600 to $900. The company is Based in Texas. - Hope this helps! - Kenny
Kenny Craft, CNU LEED AP I'm attaching two drawings I did to communicate the design and construction of the booth (a plan and interior elevation). Also, the booth was made by (Booths-forU) (http://www.boothsforu.com/). I cost about $3,000. Hope this helps... - Kenny
Kenny Craft, CNU LEED AP My last post had a little typo... "It" cost about $3,000. I also looked back on the invoice and recall the freight was in addition to this about about $600 to $900. The company is Based in Texas. - Hope this helps! - Kenny