9 account Bath Design Photos

dSPACE Studio Ltd, AIA
5 Reviews
Master Bathroom
Ideabooks36,736
Questions46
situation and one must account for enough steel and concrete to accommodate the weight of a person sitting on the bench. The marble we used is 3/4" thick with a steel support pan underneath to hold the mortar. However, behind the wall, we added a large structural steel beam to account for the overturning
“I like this bathroom because it has a large bathtub and the shower is large enough for a person to w” — alexissullivan2002
Xstyles Bath + More
4 Reviews
Lightning Bug
Ideabooks8,691
Questions23
According to the Environmental Protection Agency, home toilets account for almost 30 percent of household water use. So it stands to reason that replacing older toilets, especially those built before the mid-1990s, when the manufacturing of water-wasting toilets stopped, makes environmental and financial
“Use of Modular Arts Tiles” — kneubert
Shuler Architecture
32 Reviews
Queen Anne Kitchen Remodel 1
Ideabooks15
Questions0
guide us through this remodel process from beginning to end. His planning was precise and he came by many times to re-measure to get every detail accounted for. He was patient and helpful as we made decisions and then changed our minds! He was with us every week of the 10 weeks of the remodel. He attended
“sink setup” — rnurphy
John Whipple - By Any Design ltd.
40 Reviews
Edgemont Village (North Vancouver)
Ideabooks34
Questions0
documented this build and much of the installation process and the walk in design documented. The photo's can be found on John Whipple's photo bucket account but a password is required to view them. visit http://www.no-curb.com for infomation on how to get the password. Photo by John Whipple (By Any Design
“wall insert and tile” — juracek
Shuler Architecture
32 Reviews
Queen Anne Kitchen Remodel 1
Ideabooks23
Questions0
guide us through this remodel process from beginning to end. His planning was precise and he came by many times to re-measure to get every detail accounted for. He was patient and helpful as we made decisions and then changed our minds! He was with us every week of the 10 weeks of the remodel. He attended
“separated sinks” — donnajmattison
Shuler Architecture
32 Reviews
Queen Anne Kitchen Remodel 1
Ideabooks41
Questions0
guide us through this remodel process from beginning to end. His planning was precise and he came by many times to re-measure to get every detail accounted for. He was patient and helpful as we made decisions and then changed our minds! He was with us every week of the 10 weeks of the remodel. He attended
“another KBC vanity shower floor” — lisa7900
Chic on the Cheap
22 Reviews
Beachplace
Ideabooks1,037
Questions3
We took driftwood and made an artistic base for the sinks and used fences posts for cabinet doors to give storage at the center of the vanity. We accounted for small details like door hardware- dock cleats!
“Driftwood Vanity” — rcaughman
Inspired Interiors
22 Reviews
Luxury Spa Bathroom
Ideabooks118
Questions1
Thank you for the question! The wall application is actually a dark grey wallpaper with silver detailing from one of our trade only accounts. Please feel free to give us a call for pricing for this item and assistance with any of your interior projects.
“Very pretty” — pcutilletta
© 2014 Houzz Inc.
Houzz® The new way to design your home™