3,692 dry brushed Modern Home Design Photos

The Design Den Homes Inc.
4 Reviews
Laundry
Ideabooks8,406
Questions9
Where can I buy the drying rack ? Great room !!!
where can i buy the wall mounted drying rack?
local metal shop. Our team made the ply templates and then they were wrapped in formed brushed stainless. Cost roughly $1000 CAD.
Hi there! This particular drying rack is from IKEA....and thank you!
The trim on the washer + dryer are a brushed stainless.
laundry room layout, space for drying rack and ironing board
“Stainless countertop” — Rhonda Redding
BeautifulRemodel.com
17 Reviews
MI master bathroom
Ideabooks15,397
Questions9
MI - Master bathroom remodel with large walk-in shower, circular mosaic wet-dry bench, back lit crown molding, under-lit cabinetry. Designed by Steve Price, photo by Dino Tonn. This project won Best in Show for the National CoTY Award, 2009. Before photo at BeautifulRemodel.com
the wet-zone, so you can dry off completely. Also eliminates
The circular wet/dry bench is great. Do know how the base was built? Possibly Schluter products?
what are the dimentions of the wet dry cylinder seat? Price, colors available
What tile/material was used on the shower walls, dry-off bench, shower floor and countertop? Thank you! Lovely
drying bench within shower but outside splash area; and circular wet/dry bench half-in-half-out shower for sitting/shaving in shower and dressing outside shower
“Mosaique 3 fois” — danrobitaille
Cary Bernstein Architect
1 Review
Cary Bernstein Architect Choy 1 Residence
Ideabooks7,528
Questions6
goes with it (mold, etc.) 5. Let dry according to the directions, sand the primer, clean, and then prime again. 6. Once dry, apply an oil based gloss paint with a natural bristle brush. 7. Let the paint dry thoroughly and apply another coat. 8. After that has dried, apply a clear polyurethane finish
clean the tile thoroughly before starting. Make sure that you get all of the soap scum, grime, lime scale, etc. off of the tiles and grout. 2. Let dry, and then sand the tiles with a medium grit sandpaper until they are dull and no longer glossy. Make sure that you clean up all of the excess dust with
“Window in bathroom” — carfora
Loudoun County Interior Design Firm
We created our interior design and redecorating firm to show people that their dream house is attainable. Our true passion is to create a home that is functional and beautiful.
Sponsored
Ana Williamson Architect
4 Reviews
Cloud Street Residence
Ideabooks5,357
Questions3
damp rag rather than dry dusting, which often just brushes dust back into the air. Ideally, members of the household without allergies would take on the dustiest jobs, but if you have bad allergies and must clean, wear a dust mask — or hire a cleaning service if you can
especially important to stay on top of cleaning when allergies are a concern. Be sure to wipe surfaces with a damp rag rather than dry dusting, which often just brushes dust back into the air. Ideally, members of the household without allergies would take on the dustiest jobs, but if you have bad allergies
“lights” — eltwileiter
Ignacio Salas-Humara Architect LLC
2 Reviews
Pivot Pad, Ignacio Salas-Humara Architect
Ideabooks6,270
Questions7
it takes to clean your deck. The brushes, sealant, stain and other materials will probably cost about $150. If you hire a contractor, expect to spend between $500 and $700 for an average-size deck.Typical project length: After cleaning the deck, you’ll need to let it dry for 48 hours, so expect to spend
spend about three days on this project including drying time.Best time to do this project: During a sunny, dry period in late spring.
“Wire railings” — Terry Spradlin
Stuart Sampley Architect
16 Reviews
Dexter Residence
Ideabooks1,032
Questions1
takes to clean your deck. The brushes, sealant, stain and other materials will probably cost about $150. If you hire a contractor, expect to spend between $500 and $700 for an average-size deck. Typical project length: After cleaning the deck, you’ll need to let it dry for 48 hours, so expect to spend
spend about three days on this project including drying time. Best time to do this project: During a sunny, dry period in late spring.
“Ladrillo” — vivianahincapie
Ken Gutmaker Architectural Photography
Kitchen table
Ideabooks4,271
Questions2
process," says Watson. "If your brick is brand new, wait at least a year before painting it to allow for drying, weathering and leaching." Always clean brickwork before painting it, and allow it to dry for at least 24 hours before painting it or applying a water repellant. Don't use acid cleaning solutions
process," says Watson. "If your brick is brand new, wait at least a year before painting it to allow for drying, weathering and leaching." Always clean brickwork before painting it, and allow it to dry for at least 24 hours before painting it or applying a water repellant. Don't use acid cleaning solutions
“chairs” — Rachel Benatar
Studio Momentum Architects, PC
5 Reviews
Bathroom
Ideabooks3,917
Questions7
Installing a heat lamp and radiant heat bathroom flooring can offset the shivers. Mount a heated towel rack nearby, and you'll be extra toasty as you dry off
Installing a heat lamp and radiant heat bathroom flooring can offset the shivers. Mount a heated towel rack nearby, and you'll be extra toasty as you dry off.
Installing a heat lamp and radiant heat bathroom flooring can offset the shivers. Mount a heated towel rack nearby, and you'll be extra toasty as you dry off.
“. Prepare to combat chills. There's no getting around it — open showers can be drafty, especially” — juliemarvargas
© 2014 Houzz Inc.
Houzz® The new way to design your home™