133 closet factory Modern Exterior Design Photos

Stephenson Design Collective
4 Reviews
Peninsula Shift
Ideabooks1,680
Questions0
Efficiency. A narrow footprint opens up the possibility for prefabrication in construction. Factory construction allows site-driven issues such as weather, waste and quality concerns to be managed in a controlled environment. While the overall cost
feet (give or take) is ideal, as it preserves a narrow proportion and allows for roughly 3 feet for walking space; 2 feet for built-in cabinetry, closets or shelving; and 13 to 15 feet for living space. Narrow plans ensure you’ll always be within a few feet of a window, natural light and fresh air.
Efficiency. A narrow footprint opens up the possibility for prefabrication in construction. Factory construction allows site-driven issues such as weather, waste and quality concerns to be managed in a controlled environment. While the overall cost of prefab construction may not be lower than that of
“Narrow” — telfbailliet
Webber + Studio, Architects
8 Reviews
Tarrytown Phase II
Ideabooks3,944
Questions5
is this a custom or factory color on the garage doors? what color?
The color chart for clopay doors. Factory color Bronze http://www.clopaydoor.com/premiumsteel-windows.aspx
“Alero alto” — Quintas Río Danta
Abramson Teiger Architects
9 Reviews
Abramson Teiger Lima Residence
Ideabooks8,897
Questions5
factory painted sheet metal. Color: Weathered Zinc
exterior material is factory painted Zinc paneling by TRESPA.COM in weathered zinc color
“The wooden wall panels. The concrete retaining walls with holes.” — Angelo Inanoria
Northern Virginia Contractor
TrueBuilt is a residential and commercial contractor offering construction and design services in the Northern VA and DC Metro area.
Sponsored
Creative Space Architectural Design
The Lakes House
Ideabooks6,391
Questions3
Wall partition with closet behind
wall behind bed hide closet
closet divider
“Layout” — johnskip
Resolution: 4 Architecture
Dwell Exterior
Ideabooks497
Questions0
the microclimate. The construction process also leveraged the efficiency of wood-frame modulars, where approximately 80% of the house was built in a factory. By utilizing the opportunities available for off-site construction, the time required of crews on-site was significantly diminished, minimizing the
“Maison en L, et terrasse” — h2bernache
First Lamp
5 Reviews
Lever Homes
Ideabooks788
Questions1
with their metal folding tools so I wouldn't be surprised if they field fab'd them, although it seems like a part that would be available from the factory. This detail has been done enough that you should be able to show pictures to your sheet metal contractor and they can replicate the detail without
“Metal siding” — cecarty31
Resolution: 4 Architecture
Vermont Cabin exterior
Ideabooks842
Questions1
home for $200,000. Their winning entry — The Modern Modular — used prefabricated modules that would be trucked to the job site after fabrication in a factory. The modules, which would sit upon a foundation with mechanical services, could be configured in various ways; the winning scheme envisioned a second-floor
“Interesting” — jeffw60
Resolution: 4 Architecture
Dwell Exterior
Ideabooks1,452
Questions1
the microclimate. The construction process also leveraged the efficiency of wood-frame modulars, where approximately 80% of the house was built in a factory. By utilizing the opportunities available for off-site construction, the time required of crews on-site was significantly diminished, minimizing the
“dwell pre fab” — rao2000
© 2014 Houzz Inc.
Houzz® The new way to design your home™