Highland SCIP House

1-10-12a 280.jpg
Ideabooks1
Questions0
Pouring Third level floor
Highland SCIP House
Ideabooks0
Questions0
First level panels set with second, third and fourth level panels on site. Richard Sims
Highland SCIP House
Ideabooks0
Questions0
Floor panels ready for delivery Richard Sims
Highland SCIP House
Ideabooks0
Questions0
I am setting third level floor panels with Crain, the panels were easy to set by hand for second level floor. Third level was 22' off the ground. So safety was a key factor in using a Crain. Second and Third level floor panels were 4' X 25' X 12" Richard Sims
Highland SCIP House
Ideabooks0
Questions0
Booming third level floor panels Richard Sims
Highland SCIP House
Ideabooks0
Questions0
Setting third level walls in floor Richard Sims
Highland SCIP House
Ideabooks0
Questions0
Pulling floor panel together and hog ringing floors to walls. Richard Sims
Highland SCIP House
Ideabooks0
Questions0
Setting scaffolding to work on finishing the exterior side of the second level. Richard Sims
Highland SCIP House
Ideabooks0
Questions0
I am building first panel trying out new press. We ended up modifying press three times for strength. The hydraulics never arrived in time to be used so all panels were hand pressed. An average of 15 minutes per panel. Richard Sims
Highland SCIP House
Ideabooks0
Questions0
Booming floor panels Richard Sims