Warning to check your wind and door schedules carefully!

mojomom1 minute ago

Just spent six hours in detail comparing window schedules with elevations from the architect. It was not an easy not an easy task dealing with 51 windows in 24 different sizes. For the most part all was fine, but we found several potentially very costly mistakes that must be corrected before placing orders for windows . For exaple on one side of our living room 2 out of 3 sizes were wrong, I think the architect turned this project over to his draftsmen and no one double checked their work. Another slider was too large for the space and another too small. These were are all architect problems. We also foud a couple of other items that we simply to adjust -- ot his fault. Time consuming and detailed review, but I'd hate to imagine what would have happen had we not made the effort.

We we still love our architect and he has done a good job, but no one is perfect and some mistakes can be very costly if not caught early. Our GC recommended we go through the schedules with a fine toothed cobanfpd I'm glad we did. Architect will be receiving a long but cordial email tomorrow outlining the issues we've identified.

Comments (15)

  • 10 years ago

    I wonder if the architect feels like he should compensate you for the time you spent doing the work his firm should have done.

  • 10 years ago

    good for you - check everything. And yes - it's frustrating - and shows a bit of a lack attention to detail. Glad you found it - it would be terrible to not have the window order meet your expectations.

  • 10 years ago
    last modified: 10 years ago

    Good for you. Every document has errors. There is probably error and omission statement on the document. It is your build - you are responsible to check. Ask GC to do the same. There is also a statement stating that the Contractor must verify dimensions like this

    2. THESE DRAWINGS ARE INTENDED AS A GUIDE TO THE CONTRACTOR WHO SHALL VERITY DIMENSIONS BEFORE PROCEEDING WITH WORK. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ARCHITECT BEFORE PROCEEDING WITH WORK REGARDING CHANGES, DISCREPANCIES OR ALTERATIONS THAT ARE INCONSISTENT WITH THESE DRAWINGS.

  • 10 years ago

    When you receive a confirmations from the window company double check that as well - we caught mistakes. And even with double checking, not once, but twice, they drilled doors wrong for the hand sets for our basement and garage. Same mistake, months apart, both doors had to be re-made.

  • 10 years ago

    Preparing the window and door order is one of the first things I do after the plan has been permitted.

    However, you should be aware that the dimensions in the plan cannot always be matched by the window vendor you go with. So the person overseeing the build must make the carpentry subs aware of those variations.

  • 10 years ago

    Thanks everyone!

  • 10 years ago

    Window orders should always be checked but since that is the responsibility of the architect and builder, you may be relieving them of responsibility by doing it yourself.

    I'm not saying don't do it but I would make them do it first and then I would check it and only tell them if you find an error.

  • 10 years ago

    Good on you, mojomom!

  • 10 years ago
    last modified: 10 years ago

    Don't worry JDS, I have a firm grasp on liability issues (my line of work). I also know it's far and away cheaper on everyone to avoid anyone being faced with such a liability issue by working cooperatively.

    I pointed out the issues I found (in writing) and asked that the entire schedule be reviewed and corrected by the pros.

  • 10 years ago
    last modified: 10 years ago

    I wasn't suggesting not being cooperative or not checking the order but to alert the team of errors without indicating that you have checked the entire schedule. I would even recommend reporting that the size of a certain window was wrong rather than correcting it.

    My advice is not based on legal training but direct involvement in some seriously difficult construction document error disputes. Perhaps a single family house is not worth this level of caution but as a general rule usurping the role of a contractor or architect should be done with reasonable care as well as cooperation. That might not apply to you but it might help those you are advising to check window and door schedules.

  • 10 years ago

    The doors and windows in our cabin make up a good part of the construction budget and are one of the main architectural elements of the building with a full wall of glass facing our mountain views from the main living space. We had everyone's eyes on the door/window order before it was placed. We reviewed it, builder reviewed it, architect reviewed it. Everyone found a tweak here or there, though no major issues.

  • 10 years ago

    We have two large Andersen windows in storage from our last build 11 yrs ago, that we didn't use. I don't recall how the mistake happened but we kept the Windows which were replaced with the correct sized Windows. We eventually planned to use them in a detached garage that was designed but never built, lol.

    So here we are years later ready to build another house and I still have 2 brand spanking new Andersen 400 Windows that I don't know what to do with. Perhaps I will offer them to perspective home buyers along with the blueprints for the detached garage as an incentive!

    I think we will be more careful this time about checking our window schedule and order.

  • 10 years ago

    You can sell the windows on craigslist.

  • 10 years ago

    I should have JDS, instead of storing them all these yrs. To be honest, I've never sold anything on Craig's list and was hesitant to try.

    sold our house this weekend and included the drawings for the plans for the detached garage. Threw the windows as a freebie, lol!!