On a pier and beam house, who is supposed to build the exterior wall around the crawl space and when is the best time to build it?

The entire of the house is on pier and beam even the drive way, I would like to know the timing of the piers, drive way and sidewalk as well as the crawl space wall.

Comment (1)

  • Pinebaron

    Nothing unusual. Footings, piers, Stem walls (thats the perimeter wall around crawl space) followed by post and beams which serve as base for the first floor. We had an additional step of installing a rat slab (full 2-4” concrete floor in crawl space) following the stem walls