Having just completed an IKEA install of my new kitchen I'd thought I'd review my experience for others thinking about using IKEA. The IKEA install was part of a much larger kitchen remodel - removing walls, raising the ceiling, all new wiring, and moving ductwork - but this review is only on my IKEA design and installation experience.


I started playing with the IKEA software way before I was ready to do the final design. For the final design, we eventually used both Inspired Kitchen Design (IKD) and the IKEA in-store designer. Inspired Kitchen Design helped me think about what I really needed/wanted and what some of the tradeoffs were. Paulina, my IKD designer, was very responsive and answered all my questions. By the time I got to IKEA to work with the in-store designer I was just confirming my IKD design with the Ikea staff. My contractor liked working with the plans provided by IKD much more than the IKEA plans as they were more detailed and complete and it was worth the price just to have those plans available.


On my first visit to IKEA to do planning we discovered that the door front that I wanted was being discontinued and we needed to make a decision THAT DAY or risk not getting those doors. Because of some family issues we really couldn't commit to the plan, the delivery, etc. at that time so we risked not getting the door fronts. At our NEXT visit about 6 weeks later, we found that there were not enough of our door fronts available any longer and we quickly picked a new color scheme for the kitchen. (Shiny white Ringhult and shiny dark blue-black Jarsta doors) Making a whole new color/door selection in that visit was stressful but I'm happier with my new selection.


We opened an IKEA VISA card to pay for our cabinets and installation because you get IKEA dollars back. Those IKEA dollars would then pay for our drawer inserts and all the fun kitchen stuff you want when you start putting things into your kitchen. What I didn't realize is those IKEA dollars would expire in just a very few weeks after you got them. I waited a few weeks between my purchase, delivery and installation so I had to use the dollars before my kitchen was actually installed. That was less than optimal since I really hadn't had an opportunity to put things into cabinets and determine what I really needed. (What actually happened was my son and his family were moving into a new house and we made an IKEA trip with him to pick up things for their new house in order to spend my IKEA dollars.)


Delivery was easy. You do need a LOT of space for all the boxes of cabinets, etc. We had cleared out our entire TV room as a staging area for all the kitchen stuff (appliances, Ikea delivery, etc.) and it filled the room. The delivery people quickly stacked it into the room and left. You have time after the delivery (I think it was 48 hours or so) to do the full inventory of items and report anything that is missing. We found that it was best to sort out the piles into like items to do the inventory. Luckily our delivery was perfect and everything was there.


Although we had all of our construction work done by a general contractor they were unwilling to do an IKEA install so I arranged through Traemand, the IKEA installation company, for the actual cabinet install. When the IKEA designer finishes your design they send it to Traemand automatically and they provide you an estimate on the installation costs within a couple of days. You can get this without any commitment to purchasing or installing IKEA cabinets. I wish I had known this early in the process as I kept trying to figure out my approximate install costs to compare my IKEA prices with other kitchen cabinet prices. Don't be afraid to have IKEA do an instore design for you early in the process and get all your initial estimates when you are still in your early design/decision process. I had lots of questions about how things would be installed and how to deal with some special issues regarding plumbing, using upper cabinets as lower cabinets, etc as this was not a straightforward installation. (Is anything as straightforward as we would like?) I was able to email and talk to the estimator to make certain that what I wanted to do I really could do with the IKEA cabinets and we could figure out what my contractor needed to have ready for installers and what the Traemand installers would take care of. Adjustments were made to the installation estimate and then I was ready to figure out an install date. Once you select an install date you sign the Traemand contract and pay 50% of the estimated installation cost. You do get to make one change to the date free of charge if you discover you won't be ready or can't do the date for some reason.


Our installers came on the dot of 9 am on the installation date and got to work. First, they looked at the site and compared the plan and asked questions where it wasn't clear what was happening. They measured everything, checked for level (using a very cool 2-dimensional laser level), made certain all the materials were available. All special requests/needs were discussed (special cabinet cut outs, how to secure my top-as-bottom cabinets to the floor and still have room for the doors to open, etc.) and they priced out these changes and had us approve them. Also, since we were on the second floor of a condo building there was an extra $250 charge, and if we wanted them to haul away the trash that was another $250. I don't recall the second floor and trash charges being mentioned by my Traemand estimator although I was aware that my special installation needs would be priced once they saw the actual site.


Because we were in a condo with strict construction rules all cutting was done on my balcony. They had two table saws that they set up. It created quite a bit of sawdust but they cleaned everything when they were finished both days. We did have good space inside in which to build the cabinets and I think in a smaller space it would have been a more difficult process.


As soon as they were set up and the extra charges approved by us they got right to work. They were absolutely meticulous in assuring everything was level and square. They pointed out small flaws in the walls and suggested the best way to do the install to assure that they wouldn't be noticeable. They were clearly professionals and not just someone who knew how to put a cabinet on a wall.

At one point they pulled out two of the doors and found them to have small flaws in one corner. Instead of trying to pretend no one would notice we discussed whether someone would make the trip to IKEA to replace them or if they would just show me and my husband how to install those to door panels later. They assured us that we could easily install the two doors and showed us how to do it. Although I know I could have put those two doors on my husband decided to go to IKEA (about an 1 hr and 15 minutes drive) and pick up two new doors. Before he left on the trip I ordered the doors on-line and they were waiting for pick-up when he got there.


At the end of day 2 they placed all the appliances in their spaces (and they all fit perfectly), cleaned up everything, made certain I knew how to adjust the push openers, the lighting, and the corner pull-out and left me with beautiful new cabinets. I did have a lot of IKEA random pieces left over when they were finished. They didn't use the brackets for the island and built their own base and I knew I had a few extra doors plus the two damaged ones but there was also random stuff like 5 extra toekick panels and 21 things to attach the counters to the cabinets (my countertop person didn't want to use them) so I have a big return ($1400) to IKEA next week. Now I'm awaiting countertops, and the plumbing and electrical hookups and I'll have a new kitchen.


I found working with IKEA and Traemand to be about as good as it could be, especially since all of it was without anyone except me knowing what the actual space looked like. Good measurements are absolutely crucial, and you need to be prepared to make some decisions during the actual install so don't just go to work and think you can come home to a new kitchen (I once did that.) The cost difference between my IKEA cabinets with Traemand installation and other estimates I had for cabinets and installation from local contractors was about $10,000 which is a major cost savings and I got the modern, sleek look that I wanted for my kitchen.

Comments (13)

  • 6 years ago

    This is such a helpful post for me right now because we are just starting the process of designing a kitchen remodel and plan to use IKEA cabinets. We too have a more complicated project since we want to do more than just switch out cabinets, and I am a bit confused about which work my general contractor would do and which work I'd hire an IKEA related person to do. Where we are located there is a company that gets excellent reviews, and all they do is IKEA installs. It's too bad they can't expand their services to also do other parts of a kitchen remodel, but that's the way it is.


    So, to get this straight, you used (1) a kitchen designer of some sort who specializes in IKEA designs, (2) a general contractor, and (3) Traemand who IKEA contracts with for install. Then, you took the final kitchen designer plan to IKEA and sat down with one of their people to do the actual final order. Did I get it right? I have been trying to figure out all the steps in the process for someone who wants to take out parts of walls, do new wiring etc.


    I'd love to see photos of your finished kitchen.


    Thanks for taking the time to post this.

  • 6 years ago

    I’d love to see the photos!!

  • 6 years ago

    We had pretty much the same experience last March. Great service in every aspect of our project.

  • 6 years ago
    last modified: 6 years ago

    Me too - your tastes sound not too different than mine.


    I have also used an Ikea designer, and am now considering whether I go with Traemand or my own contractor.


    I am also deciding whether to go with an Ikea countertop or with someone else's. It sounds like it works out ok with using a separate countertop supplier/installer?

  • 6 years ago

    @julieste

    The general contractor will do everything EXCEPT install the cabinets. Traemand doesn't doe the construction work but you will need your final design BEFORE your general contractor can get started as they need to know exact measurements and where all the electrical and plumbing needs to be. Our process was:


    1) Come up with our design and find a general contractor. This meant measuring, measuring, measuring and checking with a contractor (electrician, plumber, hvac) to make certain what we wanted was even possible as we needed to move plumbing, electrical, A/C ducts, and remove a wall. I played around on the IKEA site (very frustrating but also very educational) and finally paid $300 to Inspired Kitchen Design (IKD) to do a couple of design options for me. I learned about IKD here on Houzz and although their designs weren't perfect they did help me refine what I wanted. Once I had their design I went to IKEA (a few times) and also had them do a design for me which they sent to Traemand for an estimate on the installation costs. I didn't buy the cabinets or contract for installation because I didn't want the cabinets delivered and in the way during construction, but I did have a good idea of the costs.

    2) Construction was done by a general contractor. In our area no one has experience or wants to do the installation of IKEA cabinets so first we had to find someone who was willing to do just the construction portion and let me use IKEA to do the cabinet install. You don't want someone unfamiliar with the IKEA system to learn on your kitchen install so make certain if you have non-IKEA people do it that they are very experienced. We had lots of construction work to be done before we got to the cabinet installation. I removed a wall to open the space up to our TV room, we then had to build a small wall to bring electrical to the island, we removed a dropped ceiling, moved all of the AC ductwork that was in the way of my new kitchen plan, put in all new lighting and ran new electrical wiring, and then put in a new high ceiling, and moved the plumbing line to the sink. The general contractor does all that work before you get to the cabinet installation. They need detailed design plans to assure that everything is going to fit perfectly when the cabinets are installed.

    3) Once we got to a point where we had a ceiling and walls we could have the cabinets installed. I ordered the cabinets about midway through the process and had them delivered but waited to finalize an install date. During that period my contractor had questions about how the island would be secured, who would build the base for my peninsula, etc. I was able to talk with the Traemand estimator to get the questions answered. That process was actually much easier than I anticipated. I had Traemand build the peninsula base (I was using upper cabinets as lower cabinets and they have no legs so they need to rest on something, plus I was installing a floor AFTER installation of the cabinets so I needed to assure enough clearance that the doors would open after the floor install.)

    4) IKEA/Traemand installed the cabinets. That was a two day job. When they left the appliances were in place but not hooked up, electrical work needs to be completed, countertops need to be templated and installed, plumbing needs to be reconnected.

    5) The countertop man came the following day @Hannah(he is part of my general contractor agreement, not IKEA) and measured, You don't need to use IKEA countertops. I'm actually using two countertop people as I have a mix of quartz counters in my prep areas and a wooden bartop that is being made by a different person.

    6) After my counters are installed (about 3 weeks from now) the tile person will come to do the backsplash, and finally the electrician will be back to finish the electrical hookup, hang the hood, etc. and the plumber will come to hook up the sink, dishwasher, etc.


    It seems like it has taken forever but I've done remodels before and have tremendous patience with the process. We also had Thanksgiving and Christmas in the middle of our construction which slowed things down. My husband mentioned that my first email to a contractor about getting this project started was Feb 1, 2019 so it will be just over a year from start to finish. Actual construction didn't start until Nov 11 when they did the demo of my old kitchen so I figure we will have had about three months of actual construction.

  • 6 years ago

    Dianestjohn your kitchen looks beautiful! It’s amazing that this was all done for just $13K - good for you! Did the IKEA installers add trim to the top of the cabinets so they meet the ceiling? I can’t see the tops in your photos. Thanks for posting the pics.

  • 6 years ago

    Cyc2001 thanks ?. Well the whole cabinet to the ceiling thing was somewhat annoying for me. Early on Traemand told us that since our ceilings are not level, which I guess is the case for most of their remodels, they would advise leaving a 2-inch “shadow space” above the cabinets. I googled photos of those shadow spaces and just did not love that look. So the option we chose was to take them to within an inch of the ceiling and fill in the space with trim. Before the installers added the trim, they showed me the small shadow space again and said they would advise leaving it as is, and I still felt the shadow space looked unfinished. The cabinets are designed so the tops of the cabinets are recessed from the doors to start with, so although the space above is filled with trim and caulk, to me it is not ideal, but it looks ok and I feel like I made the best choice I could under the circumstances.

  • 6 years ago

    Sorry, that question mark after “thanks” was meant to be a smiley face...

  • 6 years ago

    dianestjohn thank you for the additional pics and for the info, very helpful! It came out beautiful. I’m happy for you and hope you are enjoying your gorgeous new kitchen.

  • 6 years ago

    @cyc2001. here are a couple of pics from the tops of my cabinet. there is very thin trim at the top which is proud of the doors and cabinet sides by about 1/2 inch. the trim doesn't touch the ceiling but is maybe 1/4 inch shy of the ceiling. I needed the cabinets hung as close to the ceiling as possible so wasn't expecting enough room for any trim. the trim does make it look more finished.

  • 6 years ago

    Jaykaym, I really like your trim, I may look into adding something like that...

  • 6 years ago

    jaykaym--


    Your detailed post answering my sequence questions was incredibly helpful. Obviously, it's a much simpler process if there is just a contractor with his own kitchen designer involved. We know that. But, that's not what we want. We want to do what you did. We interviewed a contractor last week who would be fine with us doing IKEA, so we'll see what he comes back with (or if he comes back). There is a place where we are that only does IKEA plans and installs, so I am thinking about using them rather than the IKEA Treamond. Thanks again.