It would be a shame to spend thousands of dollars on a new shower and not replace that 1990 floor tile. The floor is the least expensive part of the remodel. Do the math. Often, people think it’s expensive to remove the toilet so the floor can be replaced, but it’s a simple job. You are going to have a plumber for the shower and he can remove the toilet until it’s time for him to return to finish the shower fixtures and reset the toilet at the same time.
Q
Curves
Q