title: "Beckman Builders, LLC — General Contractors | Houzz"
canonical_html_url: https://www.houzz.com/professionals/general-contractors/beckman-builders-llc-pfvwus-pf~1200495476
markdown_url: https://www.houzz.com/md/professionals/pf~1200495476.md
entity_type: LocalBusiness
business_name: "Beckman Builders, LLC"
category: ["General Contractors"]
image: https://st.hzcdn.com/fimgs/fe938e2403df8b07_9047-w400-h400-b1-p10--.jpg
address: "6343 Blanchars Crossing, Windsor, Wisconsin 53598, United States"
latitude: 43.2078
longitude: -89.3418
phone: "(608) 846-3341"
website: http://www.beckmanbuilders.com
rating: 4.8
review_count: 25
best_of_houzz_awards: 3
followers: 54
last_updated: 2026-09-08
---

# Beckman Builders, LLC

Original Houzz profile: [Beckman Builders, LLC](https://www.houzz.com/professionals/general-contractors/beckman-builders-llc-pfvwus-pf~1200495476)

## Professional summary

- **Primary category:** General Contractors
- **Location:** Windsor, WI
- **Serves:** Madison, Sun Prairie, Middleton, Waunakee, De Forest, Windsor, Lodi, Maple Bluff, Dane, Arlington, Morrisonville
- **Houzz rating:** 4.8 out of 5 (25 reviews)
- **Best of Houzz:** 3 awards (2015–2026), for Service.

## About

### Houzz Badges

- Recommended on Houzz
- 25 Ideabook Saves

Karl Beckman started Beckman Builders, LLC in 2003. He has a Consumer Science degree from UW Madison. Karl is a member of NARI (National Association of the Remodeling Industry) and is a Certified Remodeler with them. NARI certification of professional remodeling contractors serves as the association's recognition of remodeling professionals who have met stringent criteria for experience and pledged a commitment to high standards of practice and NARI's Code of Ethics. To become a Certified Remodeler, candidates must possess skill and knowledge in a broad range of business management and technical areas. Beckman Builders, LLC is also a member of the Better Business Bureau (BBB) with an A+ rating.

### Services Provided

- Home Remodeling
- Bathroom Remodeling
- Kitchen Remodeling
- General Contracting
- Home Additions
- Deck Building
- Basement Remodeling
- Garage Building
- Porch Design & Construction
- Custom Home Bars
- Wood Floor Installation
- Attic Conversion
- Window Replacement
- Window Installation
- Exterior Door Installation
- Stair Installation
- Deck Repair
- Laminate Flooring Installation
- Sliding Door Installation
- Attic Restoration
- Trim Work
- Crown Molding Installation
- Shed Design & Construction
- Baseboard Installation

### Areas Served

- Madison
- Sun Prairie
- Middleton
- Waunakee
- De Forest
- Windsor
- Lodi
- Maple Bluff
- Dane
- Arlington
- Morrisonville

## Business Details

| Field | Value |
| --- | --- |
| Business Name | Beckman Builders, LLC |
| Address | 6343 Blanchars Crossing, Windsor, Wisconsin 53598, United States |
| Phone | (608) 846-3341 |
| Website | http://www.beckmanbuilders.com |
| License Number | 963168 |
| Followers on Houzz | 54 |

**Social profiles:**
- Facebook — https://www.facebook.com/BeckmanBuilders
- Blog — https://beckmanbuilders.com

## Offers

(DEMO) OFFERS _(DEMO) DISCLAIMER_

## Contact

- **Houzz profile:** [Beckman Builders, LLC](https://www.houzz.com/professionals/general-contractors/beckman-builders-llc-pfvwus-pf~1200495476)
- **Website:** http://www.beckmanbuilders.com
- **Phone:** (608) 846-3341

## Credentials

**Certifications & Awards**
- Certified Remodeler from NARI
- 2013 - 2016 ACE (Achievement in Consumer Excellence) from NARI
- BBB - A+ rated

- **Best of Houzz:** 3 awards (2015–2026), for Service.

## Reviews

**Overall rating: 4.8 out of 5 — 25 reviews**

*Aspect averages:*
- Work Quality: 42.0
- Communication: 42.0
- Value: 42.0

### Reviews

**★★★★★ — MM Jelinek, June 2026**

> We have hired Beckman Builders on several projects over the years and continue to work with them due to their attention to detail and dedication to making sure the project is complete to our satisfaction.  The first project was in 2012 with a first phase window replacement followed by the second phase a few years later.  Then in 2019 they constructed a new garage for us.  Most recently, in 2024 they began renovation of our kitchen and two bathrooms.  For each of these projects Karl worked with us to review the project design, scope and cost options that would work within our budget.  They made adjustments along the way as we reviewed potential scope changes.  They provided a project schedule and notified us of delays associated with supplier deliveries, but they were always quick to complete the work once the products arrived.  During the interior renovations, they installed plastic barriers to contain construction dust and let the job site clear and organized at the end of each work day.  We have been very happy with their quality of work and their willingness to meet our expectations within reasonable understanding of responsibilities of each party.  The only cost/budget changes during the construction were associated with change orders for agreed upon additional work items.  We have a few more home projects planned in the near future and look forward to working with Beckman Builders again.

**★★★★★ — Jacquelyn Boggess, March 2026**

> We’ve worked with Beckman Builders twice now—first for a kitchen update and more recently for a full bathroom remodel—and both projects turned out beautifully. Their design process made it easy to visualize the finished space, and the team delivered exactly what we’d hoped for on time and within budget. They kept the work area organized, communicated clearly throughout, and their craftsmanship is outstanding. We love our new spaces and wouldn’t hesitate to work with them again or recommend them to anyone considering a remodel

**★★★★★ — Peter Hans, Jan. 2026**

> We have used Beckman Builders for two remodeling projects and both turned out great.  The first project was a second floor bathroom remodel.  The second project was much more extensive: the tear-out and reconstruction of our kitchen, first floor bathroom and home office area.  We worked with Beckman's designer to plan the changed layouts and select materials.  We attended the pre-construction walk-through with the subcontractors, which was helpful to us and them.  The project took several months and was completed when when we expected it to be completed.  Communications with our project manager went well.  He was on site frequently, spoke with us regularly by phone, and always promptly responded to our text messages.  Beckman's carpenters did excellent work, as did all of the subcontractors.  Everyone was professional and friendly.  At the end of every day the site was cleaned up and our house was secured (there were times when we were traveling while work was being done).  Also, Karl Beckman kept in touch with us and met with us during the course of construction.  We are so pleased with the the final outcome.  We would not hesitate to use Beckman Builders for another project and would recommend them to others.

**Comment from Beckman Builders, LLC:**

> Peter,
> Thank you for sharing another thoughtful review and for trusting us with not just one, but two remodeling projects in your home. We truly appreciate the confidence you’ve placed in our team over the years.
> It’s great to hear that working with our in‑house designer made the planning process smooth and that the pre‑construction walk‑through helped set clear expectations for everyone involved. We’re also glad that the communication with your project manager kept the project moving at a steady pace and made you feel well‑supported throughout—whether you were home or traveling.
> Our carpenters and subcontractors take pride in their craftsmanship, professionalism, and daily cleanup efforts, so your acknowledgment means a lot to the entire crew. It was also a pleasure staying in touch personally as your project progressed.
> Your kitchen, first‑floor bathroom, and office space all turned out beautifully, and we’re thrilled to know you are so pleased with the final results. Thank you again for your trust and for recommending Beckman Builders to others. We look forward to the opportunity to work with you on future projects.
>
> The Beckman Builders Team

**★★★★★ — G Meyers, Dec. 2025**

> Like me, you may have seen yard signs for Beckman Builders or seen them at a home show. After considering some of their competitors, we hired Beckman Builders for an exterior project, replacing an existing deck and cement entry stairs leading to our front door.  We had a good first impression and felt comfortable moving forward after that initial meeting.
>
> They have a clear and well-organized process with an initial project review meeting, where we communicated our budget constraints and desired timing. Unlike most other companies we considered, their proposal landed within our target budget, which led us to sign a pre-construction agreement to finalize details, and we eventually signed the construction contract. Their estimating process is very thorough, but it took a little longer than expected. However, we appreciated the thoroughness. All other aspects of the project were timely and kept on track.
>
> Communication throughout the project was very good. There was a minor issue with our selected deck railing material compared to the original contact specified in the contract, and there was some shared responsibility there. We appreciated how Beckman Builders handled it professionally, ensuring it was resolved.
>
> Brian, our project manager, did a great job communicating project status. Mike and Nickey, the carpenters, and the rest of the team were all great to work with. We even hired the landscaper back for more work after the project. We also found the Buildertrend system easy to use for checking the schedule, communicating, approving change orders, and making payments.
>
> The quality of the finished work really stood out, with compliments from neighbors and questions regarding our experience with Beckman. The crew was there when they said they would, stayed on schedule, and delivered results in line with our expectations. Their pricing was right in the middle compared to other bids we received and aligned well with our budget.
>
> Overall, we had a very positive experience and would definitely hire Beckman Builders again.

**Comment from Beckman Builders, LLC:**

> Thank you for the kind words and for trusting us with your project.  It was a pleasure working with you and we look forward to helping you with your next project.

**★ — Kevin Henry, Oct. 2025**

> Working with Beckman Builders was a deeply frustrating experience and incredibly disappointing!! Our major renovation on a 111-year-old home took 17 months—far beyond the promised six weeks. Poor communication, lack of professionalism, poor workmanship and repeated deflection defined the project.
>
> I was specifically told to view the online schedule showing a 41-day project. After the fact, I've been told it was never meant for my viewing. Karl tries to state that additional work orders are the cause for the 17-mon project, not the fact that they had to redo much of their window and door installation because of their initial poor install.
>
> The house was left unwrapped during heavy rains, causing water damage and soaked insulation. We had to fight to have this remedied and Karl's scientific way of detecting moisture level was to poke his finger into holes.
>
> We had to fight for basic standards like a portable toilet for over 30 subcontractors. The owner of Beckman Builders thinks it's ok to have 30+ strangers use your home bathroom, whether you are home or not, just because he put it in the contract. A second time when crews came out to fix their original improper installation, Beckman outright denied my request for a bathroom, leaving workers to pee in our yard.
>
> We often acted as project managers ourselves, correcting mistakes and addressing safety hazards like exposed steps and debris. The attached photo explicitly shows the steps completely open and dangerous, though Karl repeatedly acts as if it is no big deal.
>
> Poor workmanship was the standard. Exterior door re-installed with a rotten frame, exterior doors improperly installed, 17 of 30 new windows leaked cold air due to missing insulation. The cold air coming in was ONLY due to the fact that the windows were not foamed properly when initially installed. That is the ONLY reason. Anything else stated is just a diversion from this truth. Karl has repeatedly called these "warranty work" instead of what they truly are, extremely poor workmanship during the initial install. Karl dismissed our concerns, blamed humidity, and only acknowledged issues after expert inspection.
>
> After months of pressure, Beckman Builders offered a modest financial concession—but only if we signed away all warranties and our right to speak publicly about the experience. He also tied our ability to receive our lien waivers to us signing his Settlement Agreement, which is unlawful (Wisconsin Statute § 779.05).
>
> The photos tell the true story. Rotten door frame, windows missing foam insulation, ice on inside window frames, house left unwrapped, dangerous steps exposed, poor workmanship.
>
> Given the owner’s persistent deflections and verbal sleight of hand in place of real accountability, we will never hire or recommend this company.

**Comment from Beckman Builders, LLC:**

> The project began in May 2024, and the final invoice was sent on November 12, 2024. After completion, some warranty issues were discovered that required follow-up.
>
> Per our contract, the project was to be substantially complete within three months of the start date. At the beginning of the project, we were experimenting with Buildertrend schedules internally and did not realize that a draft version had been shared with you. That schedule was not finalized or intended for client viewing. We were learning the system to eventually share accurate project timelines with clients.
>
> During the project, there were several approved change orders that extended the original timeline. For example:
>
> The upstairs door change order extended the project by approximately two months (for door delivery), plus three additional days for painting and one day for installation.
>
> The rot repair change order added roughly three weeks.
>
> When the existing patio door was found to be rotted, a new change order was approved on April 7, 2025. While we failed to document the extended timeline for ordering and installation, the new door was installed by the end of July — within days of its arrival from our supplier.
>
> You are correct that the house wrap was not installed immediately after the old siding was removed, and some water entered the wall system, wetting portions of the new insulation. We investigated and identified affected areas, removing sheathing and any wet insulation as needed, then installing new insulation and sheeting. This oversight was our mistake, but we corrected the issue and repaired the damage.
>
> We also brought in our window and door representatives to assess performance issues. It was determined that one door had arrived warped from the manufacturer and required replacement — unrelated to our installation. Upon further inspection, we discovered that some interior foam was not applied properly and that there were gaps in the old window frames allowing cold air infiltration. While insert windows often leave inaccessible gaps, in this case we did have access to certain areas that should have been foamed. We removed the interior stops, added backer rod, and applied spray foam to seal air leaks.
>
> Regarding the French door, it was not part of the original project scope. A change order was later approved for wall rot repair, and since the door appeared sound at that time, we reinstalled it. When issues later arose, we discovered the frame was rotted and needed replacement — something we unfortunately did not detect earlier.
>
> As outlined in our contract, the homeowner is responsible for providing restroom facilities for workers. This clause was part of the signed agreement and not added afterward. Once you raised your concerns, we added a portable restroom to the project scope.
>
> This project involved a full exterior renovation. There were three alternate exits available during construction. We temporarily boarded off one section of the steps to complete related work, and while we maintained daily cleanup, a construction site inherently involves some debris. In hindsight, adding a temporary safety fence could have provided an additional layer of protection, and we’ll consider that on future projects.
>
> To clarify, we never stated that cold air was caused by high humidity. We explained that humidity can cause window condensation — something you were also experiencing — and that drafts were likely due to insert window limitations. Later, we found that during interior stop rework, small openings were created, allowing air movement, which we then sealed with foam. We continued investigating and addressing each concern until the issues were resolved.
>
> We had already applied a discount on the final invoice to acknowledge the inconvenience you experienced. When you requested an additional discount, we proposed a settlement agreement. Ultimately, you chose to pay the full balance rather than enter into the settlement.
>
> We understand this project involved several challenges and sincerely regret any frustration it caused. However, we believe we acted responsibly, addressed all issues, and stood behind our work throughout the process.

**★★★★★ — Dalia Dannenberg, April 2018**

> We hired Beckman Builders to do an addition to our laundry room.  We wanted to make it a fully functional laundry and storage area.  Working with Karl and his staff were great.  Karl designed around our needs and wants for a great new floor plan.  His staff and subs were professional and did really great work.  Would definitely hire again.

**★★★★★ — Kim King, March 2017**

> Beckman Builders did an outstanding job on our master bathroom (partial remodel) -  We were thrilled with how it turned out. Everyone on the crew was knowledgeable, and courteous, and their workmanship was excellent!  Would absolutely use them again!

**★★★★★ — susanelbe, March 2016**

> Karl Beckman and his crew remodeled my master bathroom. They took it down to the studs but did not change the footprint. The remodel consisted of removing the old bathtub and putting in just a shower, new toilet, new floating vanity, countertop, and sinks, new cabinetry, new tile flooring, new LED lighting, and redo of the walk-in closet. They also put new baseboards throughout the master bedroom. Karl's crew is courteous, friendly and knowledgeable. I was comfortable having them in my home, which means a lot to me. Karl is fair and always willing to work with his customer to give satisfaction. Highly recommended!

**★★★★★ — ppevans, March 2015**

> Beckman Builders put in new Anderson windows on the east side of my 74 year old home.  I hired this company.  The contractor measured the windows and the brought the Anderson window person and measured again.  The house is old and 2 windows had to be special order because Anderson did not make that size. I hired this company because they remodeled my kitchen and did an excellent job. The windows were ordered and installed.  The workers had to be careful because of possible lead paint and asbestoes but there was none.  They put in insulation which was not done originally.  The workmen worked well together.  The windows looked like the other windows in the rooms.  Rained delayed some of the work was completed by their deadline and stayed with in the budget.  The rooms were left very clean after the installation.  The contractor carefully inspected all of the finished work to make sure everything was done correctly.  I was very pleased with the installation of the new windows.

**★★★★★ — savokk, March 2015**

> Used them on two separate occasions.  I am very happy with the quality of work they provided.  I am sure I will be using them again in the future.

**★★★★★ — digick, March 2015**

> We previously had  new deck rails, supports, and new roof put on our existing 10x30 screen porch. We held off on all new exterior flooring and floor supports. We had this all replaced last fall including new steps. We called Karl to give a bid. He did the previous work and we were very happy with the results. This phase looks great and came in right on the bid. Karl also told us when we did the roof etc. about how many more years the original flooring would last and he was correct so we were not surprised and planned for it.

**★★★★★ — mtessner, March 2015**

> Beckman Builders rebuilt the stairs to our garage to accommodate my husband's use of a walker to navigate.  The job was done in the time frame promised and the stairs are as promised and very sturdy.
>
> Beckman Builders also installed some grab bars to make our bathroom safer for my husband after he fell and broke a hip.  He can now navigate in there without worry.  Again the job was done on time and on budget.
>
> We will have Beckman Builders back again and again in the future for further updating and remodeling in our 30 year old ranch--windows, doors, kitchen, possibly some siding--all need a facelift.

## Selected projects

- [Poynette Screened Porch and Deck Project](https://www.houzz.com/hznb/projects/poynette-screened-porch-and-deck-project-pj-vj~6439931)
  - Location: Not specified
  - Photos: 7
- [Merrimac Double Deck Screened Porch Project](https://www.houzz.com/hznb/projects/merrimac-double-deck-screened-porch-project-pj-vj~6439860)
  - Location: Not specified
  - Photos: 18
- [Verona Area Screened Porch Project](https://www.houzz.com/hznb/projects/verona-area-screened-porch-project-pj-vj~6439847)
  - Location: Not specified
  - Photos: 7
- [Verona Area Deck Project](https://www.houzz.com/hznb/projects/verona-area-deck-project-pj-vj~6439841)
  - Location: Not specified
  - Photos: 9
- [Seminole Forest Neighborhood Home Remodel with an Open View-Designer Lori L.](https://www.houzz.com/hznb/projects/seminole-forest-neighborhood-home-remodel-with-an-open-view-designer-lori-l-pj-vj~702267)
  - Location: Not specified
  - Photos: 5
- [Madison Condo project - Designer Dan L.](https://www.houzz.com/hznb/projects/madison-condo-project-designer-dan-l-pj-vj~1251094)
  - Location: Madison, WI
  - Photos: 10
  - Description: Contemporary bathroom remodel project in Madison, WI with white painted flat panel door.
- [DeForest Kitchen](https://www.houzz.com/hznb/projects/deforest-kitchen-pj-vj~3120337)
  - Location: DeForest, WI
  - Photos: 6
  - Description: The kitchen in this Deforest home was built in the basement as part of the original house plan. Beckman Builders was called in to help update the old tired layout. It had a tile floor with a poorly designed transition to the wood floor which caused a tripping hazard. Beckman Builders relocated the appliances and raised the new tile to eliminate the tripping hazard. They also added a breakfast bar, laminate countertops with a new drop-in Kohler sink, and replaced the patio door to the backyard. T…
- [Middleton Mudroom](https://www.houzz.com/hznb/projects/middleton-mudroom-pj-vj~3120004)
  - Location: Middleton, WI
  - Photos: 6
  - Description: This Middleton home had a congested and tight mudroom with a washer and dryer in the closet. The 3-car garage was very spacious with extra storage in front of the third parking stall. Beckman Builders redesigned the layout of the new mudroom to include the extra space in front of the third garage stall. After moving the wall, they had room to add a new window which allows for natural light. Cubbies for the kids, pantry cabinet storage, a refrigerator, a wash sink, and a stacked washer and dryer…
- [Front Porch & Landscaping](https://www.houzz.com/hznb/projects/front-porch-and-landscaping-pj-vj~2889191)
  - Location: Not specified
  - Photos: 5
  - Description: The customer wanted to change the look of the front of their house and also desired a place to sit to enjoy their morning coffee. The existing roof over the stoop was sagging and the retaining wall was falling over and was too close to the garage door. The retaining was was torn down and re-worked to allow for better garage access. We re-used the same retaining wall blocks that they had before. The porch and sidewalk were torn out and we built a new wood structure for the porch. We installed com…
- [Full Kitchen Remodel](https://www.houzz.com/hznb/projects/full-kitchen-remodel-pj-vj~2778577)
  - Location: Not specified
  - Photos: 4
  - Description: In addition to the wonderful new kitchen, the ceiling was sagging so we fixed some ceiling joists that had been notched and since the ceiling was not level we installed a strip to level out the ceiling. We patched the wood floor where necessary to work with the new layout and then sanded and finished the floor. The outside wall was opened up to add new spray foam insulation which helped to keep the space warm (the old kitchen was always cold). We added a new window in the dinette to closely matc…
- [Sunroom](https://www.houzz.com/hznb/projects/sunroom-pj-vj~802829)
  - Location: Not specified
  - Photos: 15
- [Kitchen (T)](https://www.houzz.com/hznb/projects/kitchen-t-pj-vj~802136)
  - Location: Not specified
  - Photos: 14
- [Kitchen Remodel](https://www.houzz.com/hznb/projects/kitchen-remodel-pj-vj~780470)
  - Location: Not specified
  - Photos: 27
- [Basement Remodel](https://www.houzz.com/hznb/projects/basement-remodel-pj-vj~773472)
  - Location: Not specified
  - Photos: 21
- [Kitchen Renovation](https://www.houzz.com/hznb/projects/kitchen-renovation-pj-vj~733906)
  - Location: Not specified
  - Photos: 9
- [Traditional Kitchen Remodel](https://www.houzz.com/hznb/projects/traditional-kitchen-remodel-pj-vj~771585)
  - Location: Not specified
  - Photos: 5

[See all 16 projects](https://www.houzz.com/professionals/general-contractors/beckman-builders-llc-pfvwus-pf~1200495476)

## Community Q&A

**Q: Can you provide the details of the vanity?** *(in Photo Questions)*

A: We used standard mirror hardware.  We did use a metal frame around the mirror to mimic the metal in the glass doors (not shown in this picture).

**Q: Cost** *(in Photo Questions)*

How much did it cost for this basement?

A: Because of customer privacy I don't typically share costs of projects with others.  All of our projects are priced on a case by case basis rather than a square foot price.  Depending on where you are located I would be happy to come out and look at your basement and then would be able to prepare an estimate based on your space and needs.

---

*Source: Houzz professional profile. Reflects the profile as of 2026-09-08.*