---
title: "Time 2 Remodel, LLC. — Design-Build Firms | Houzz"
canonical_html_url: https://www.houzz.com/professionals/design-build-firms/time-2-remodel-llc-pfvwus-pf~59018042
markdown_url: https://www.houzz.com/md/professionals/pf~59018042.md
entity_type: LocalBusiness
business_name: "Time 2 Remodel, LLC."
category: ["Design-Build Firms"]
image: https://st.hzcdn.com/fimgs/52b3dac101451959_2971-w400-h400-b1-p10--.jpg
address: "1218 Gilson St., Madison, WI 53715, Wisconsin 53715, United States"
latitude: 43.0653
longitude: -89.4
phone: "(608) 212-0633"
website: http://www.time2remodel.com
rating: 4.8
review_count: 12
best_of_houzz_awards: 4
followers: 72
last_updated: 2026-08-24
---

# Time 2 Remodel, LLC.

Original Houzz profile: [Time 2 Remodel, LLC.](https://www.houzz.com/professionals/design-build-firms/time-2-remodel-llc-pfvwus-pf~59018042)

## Professional summary

- **Primary category:** Design-Build Firms
- **Location:** Madison, WI 53715, WI
- **Serves:** Madison, Sun Prairie, Fitchburg, Middleton, Verona, Stoughton, Oregon, McFarland, Monona, Shorewood Hills, Maple Bluff, Mc Farland
- **Houzz rating:** 4.8 out of 5 (12 reviews)
- **Best of Houzz:** 4 awards (2015–2022), for Service.

## About

### Houzz Badges

- Houzz Influencer
- Recommended on Houzz
- 1,000 Ideabook Saves

We are a full service remodeling company who helps the homeowner through the remodeling process.  We provide designs and personal product selections that ensure quality and customer service go hand and hand.  Let us help you from concept to completion to get the room you are looking for.

### Services Provided

- Kitchen Remodeling
- Bathroom Remodeling
- Basement Remodeling
- Remodeling

### Areas Served

- Madison
- Sun Prairie
- Fitchburg
- Middleton
- Verona
- Stoughton
- Oregon
- McFarland
- Monona
- Shorewood Hills
- Maple Bluff
- Mc Farland

## Business Details

| Field | Value |
| --- | --- |
| Business Name | Time 2 Remodel, LLC. |
| Address | 1218 Gilson St., Madison, WI 53715, Wisconsin 53715, United States |
| Phone | (608) 212-0633 |
| Website | http://www.time2remodel.com |
| License Number | 1127930 |
| Followers on Houzz | 72 |

**Social profiles:**
- Facebook — http://www.facebook.com/pages/Time-2-Remodel-LLC/136510516419092
- LinkedIn — http://www.linkedin.com/
- Blog — http://www.time2remodel.com/

## Contact

- **Houzz profile:** [Time 2 Remodel, LLC.](https://www.houzz.com/professionals/design-build-firms/time-2-remodel-llc-pfvwus-pf~59018042)
- **Website:** http://www.time2remodel.com
- **Phone:** (608) 212-0633

## Credentials

**Certifications & Awards**
- National 2016 NARI CotY Award--Basement under $50,000
- Regional 2017 NARI CotY Award--Kitchen under $50,000

- **Best of Houzz:** 4 awards (2015–2022), for Service.

**Affiliations**
- [National Kitchen &amp; Bath Association](https://www.houzz.com/professionals/schools-and-organizations/national-kitchen-and-bath-association-pfvwus-pf~1351084655)
- [NARI of Madison, Inc.](https://www.houzz.com/professionals/schools-and-organizations/nari-of-madison-inc-pfvwus-pf~59227702)

## Reviews

**Overall rating: 4.8 out of 5 — 12 reviews**

*Aspect averages:*
- Work Quality: 50.0
- Communication: 50.0
- Value: 50.0

### All 12 reviews

**★★★★★ — Kasey Oetting, April 2021**

> Time 2 Remodel recently finished our basement, and we couldn't be more pleased. They were very helpful from the beginning to the end of the process, and were very forthcoming with information / recommendations. They treated us with a high level of respect, and really wanted to learn about what we wanted to do with our space, and provided additional recommendations. They came in cheaper than some of the other quotes that we had, but the quality was not lacking. They finished the project on time (started a little early, and even finished a little early from original estimates) and worked with us when we wanted to save a little bit of money and let us paint. I would highly recommend Time 2 Remodel to anyone looking to work on their basement / kitchen / bath.

**★★★★★ — Amber Dolphin, Jan. 2018**

> We really enjoyed working with Time 2 Remodel and now really love our new kitchen! (We gutted the kitchen, took down a wall and moved our laundry room door to a different wall.)
>
> Curt took a lot of time with us in the beginning and showed us a prelim design so we knew what to expect and the direction of our project. We liked our connection with him. Throughout the project we then worked with designer, Janean, and she was great about meeting with us at various shops in town to help pick our design choice. This was super helpful! She also would get back to us on our many questions. We will use them in future projects! Thanks Time 2 Remodel.

**★★★★★ — HU-675576, Aug. 2016**

> Kurt was one of few people to respond to my request for an est. Once the job began, he and his wife Janine kept us informed through the whole prosess. Jeremy the.carpenter involved with the project was very personable and took time to have a cup coffee with us and explain what he wanted to accomplish that day. The project turned out even better than I expected, thanks to Jeremy. He's a bit of a perfectionist and was not satisfied until everything was just the way I wanted it.

**★★★★★ — Jeri Grogg, Aug. 2016**

> My husband and I were extremely fortunate to have found Time2Remodel to upgrade our powder room. Curt did a very thorough initial estimate, which was what we actually paid for the job. Janean was extremely helpful in showing us possible fixtures to select for the room. The subcontractors, from the demolition team to the electrician to the painter to the plumber, all did an outstanding job. Pete, the lead carpenter, was a delight to work with and showed great patience and skill in his work. He also very graciously agreed to raise the height of the sink, even though it meant a bit of extra work as the project was nearly completed.
>
> We could not be more pleased with our "new" powder room and highly recommend Time2Remodel. In closing, we greatly appreciated being able to contact Curt and Janean via email when we had questions. Their prompt replies were especially helpful in keeping us informed as to the timetable for each part of the remodel.

**★★★★★ — Patrick Farabaugh, July 2015**

> My husband and I worked with Time 2 Remodel on both our kitchen and our bathroom. we were very impressed with how thoughtful, professional, and accommodating Curt and his team were throughout both projects. Curt was mindful of our budget, and went beyond what I thought was reasonable to expect of him to make sure that we stayed on budget and were happy with the choices we made. Our condo was unique in that it was a post World War II barracks built using stone, cement, and spancrete. Needless to say, it presented some real design/upgrade challenges in order to turn it into our vision of a modern and contemporary urban space. Curt and his team rose to the occasion though, and I believe made our unit one of the best in our entire condo association.

**★★★★★ — catherineabriggs, July 2015**

> Time2Remodel did a kitchen remodel for us and we are very pleased with the results.  The project included replacing all of the cabinets, removing bulkheads so there was room for taller cabinets, replacing all of the lighting, revising the layout in the kitchen to improve the workflow and appearance, installing new appliances and a sink, doing a tile back splash and painting.  They also did a partial remodel in our first floor bathroom including replacing the toilet, vanity, sink and lighting, installing a new inset medicine cabinet and painting.   Time2Remodel provided a thorough and accurate estimate of the cost and the timeline so we knew what to expect on both counts.  We felt that they listened to our concerns and desires for both spaces and prepared a plan that respected our budget and provided what we needed.  Based on their experience they were able to suggest ways to achieve our goals that were practical, cost effective and provided the look that we wanted in our spaces.   All of the workmen they used were professional and responsive to questions and concerns.  Whenever we had questions Time2Remodel was prompt in responding and addressing our issues.  We would definitely go back to them for future projects in our home.

**★★★★★ — glamdoc, May 2015**

> We hired Time 2 Remodel to redo all of our bathrooms (2 full baths, one powder room) and most of the lighting in our home after we received time and cost estimates from several companies in the local area. They came out at the most reasonable cost and shortest time to complete. Every member of the team was respectful, skilled, and willing to address any situations that arose as the work began.
>
> The master bath had a complete overhaul, whereas the second bath and powder room were updated from top to bottom. They also installed recessed lighting in three different areas in our home in addition to updating all of the remaining light fixtures. We could not be happier and some of our neighbors and many of our friends are also working with them after they saw the amazing quality of the completed work in our home.
>
> They stayed close to or on their timeline and it was a real pleasure working with them.

**★★★★ — rakjulie, March 2015**

> I hired time 2 Remodel to remodel 1st floor bathroom, main floor kitchen and construct a new bathroom and shower in basement.  The budgeting was reasonable and came in just about where we thought it would. Curt and Janine helped select product, as they have a wonderful knowledge of product and vendors that they work with. Bought extremely good quality products and carpenters and all subs, heating, electrical plumbing all highly skilled craftsman that were quick and creative when necessary.  Work site always kept clean and all workers showed up when they were scheduled to be here.. Had a number of little surprises as with all projects but Curt and his team dealt with quickly... I am extremely pleased with the quality of work and skills of the craftsman involved.. I have and will continue to recommend them and would have them in and do work for me again...

**★★★★ — lisahawk24, Aug. 2014**

> Overall, I was very satisfied with the work done by Time 2 Remodel.  We decided to go with them to remodel our kitchen because they were recommended to us by a co-worker and their quote was comparable to other companies that quoted our project.  They started the project in the time frame they had originally quoted.  They quoted 2 weeks for the project duration, and they project ended up taking 3 weeks.  The beginning of the project went as expected, but slowed down at the end to get the last few items taken care of.  There were a few small mistakes along the way that were fixed promptly upon asking.  We are very pleased with the quality of the work that was done.  Only "negative" is that they duration of the project exceeded what we were originally quoted.

**★★★★★ — schefers, Aug. 2014**

> Time 2 Remodel was hired for a full kitchen gut and remodel of our 1950 ranch style home.  The total cost of the project was roughly $35,000.  Time 2 Remodel helped us with the design of our new kitchen and their remodeling services included:
>
> •Installation of cabinets, countertops, hardwood flooring, appliances, lighting
> •Updated electrical
> •Removal of wall
> •Addition of patio door
>
> House renovations of any kind can be very stressful, but there was little to no stress with our project since Time 2 Remodel was always well prepared and on schedule.  Some highlights of this company below.
>
> •Stayed on Schedule – Stuck with the timeline given to us at the beginning of the project and never had delays.  Project timeline was 10 months and they met this deadline
> •Professional & Easy to Work with – The Time 2 Remodel Team of Curt and Janean were always easy to reach for questions and updates.  It was such a pleasurable experience to work with them that I can’t imagine working with anyone else for future remodel needs
> •Stayed within our budget – The total cost of the project did not deviate from our quote given at the start of the project
> •Quality of Work – All of the sub-contractors did an excellent job and Time 2 Remodel definitely has a great team working for them.  The products were outstanding as well…from the cabinets, to the flooring, to the Quartz countertops, etc.
>
> The only negative was that the drywall sub-contractor was a bit messy, but this seems to be a common problem with drywall professionals.
>
> Overall, HIGHLY recommend Time 2 Remodel and definitely will use them for our future remodel needs.

**★★★★★ — Mimi Li, June 2014**

> We needed our basement to be finished after buying a new house. We first had an estimate from 4 different remodeling company and Curt from Time 2 Remodel was not only professional, but the most personable and with the most fair quote.
> During the process, they would go out of their way to accommodate our requests and gave us suggestions that turned out really well in the end. Curt was super patient with me when I couldn't find the wood I liked through his supplier and he went online and looked for other products for me. They finished on time and we were absolutely satisfied with the results.
> We would definitely hire them again for future projects and highly recommend them!

**★★★★★ — Gerhard’s Kitchen, Bath & Lighting Store, March 2014**

> We are a proud partner to Curt and his team. Having seen first hand the quality of craftsmanship Time 2 Remodel provides has given us great confidence in designing cabinetry that we know will be beautifully installed. We have the recognition to go along with that, having been selected as 2013 Chrysallis Award winners in two categories: Kitchen Remodel $50,000 to $75,000 and Bath Remodel under $40,000.

## Selected projects

- [Love your BASEMENT](https://www.houzz.com/hznb/projects/love-your-basement-pj-vj~7139413)
  - Location: Not specified
  - Photos: 8
  - Description: The basement lacked purpose in this 1962 ranch home. Looking for extra family space, the homeowner requested reconfiguring the usable space and incorporating some of the additional storage room. Here is what we helped change: --reframed to include extra storage room and 2 existing windows --painted ceiling black to capture full height --added lvp flooring and new wood door to existing laundry/bath --reconfigured existing boiler heat for new layout --painted stairs and updated railing and carpet…
- [From White to Wood KITCHEN](https://www.houzz.com/hznb/projects/from-white-to-wood-kitchen-pj-vj~7139317)
  - Location: Not specified
  - Photos: 9
  - Description: This 2004 builder's grade kitchen didn't fit the current retired owners ADA needs and love of wood. The original layout of the fridge wall had it farther from the work triangle and narrowing the entrance for accessibility. Even though walls were not moved, the kitchen function/flow could be improved. Here is how we helped: --replaced existing painted cabinets with cherry wood extended to the soffits --replaced high micro/hood with low microwave drawer by fridge --added LED under cabinet lighting…
- [Golden Oak to Moonlight KITCHEN](https://www.houzz.com/hznb/projects/golden-oak-to-moonlight-kitchen-pj-vj~7139310)
  - Location: Not specified
  - Photos: 9
  - Description: When the builder grade golden oak cabinets in this 1993 home needed updating, the homeowners selected a warm green-gray taupe colored finish called Moonlight. A few other upgrades were requested. Here is how we helped: --removed built in closet for more countertop space --increased storage height of wall cabinets --removed hard ceramic tile for modern LVP --changed all lights to LED and added pendants --installed quartz countertop & backsplash tile All the changes have added function and moderni…
- [BASEMENT Mid century Makeover](https://www.houzz.com/hznb/projects/basement-mid-century-makeover-pj-vj~7139301)
  - Location: Not specified
  - Photos: 12
  - Description: The 1977 basement didn't offer the functions that the current young family was needing. A family room with basement guest room & bath were required. A wet bar was also something requested for the new layout. Here is what we changed: --removed existing walls & drop ceiling --framed new to expand into unfinished space --added egress window & bath/bar plumbing --installed custom tile pattern & LVP flooring --selected Mid Century influenced fixtures The resulting Mid Century inspired space now is us…
- [Refined Rustic MASTER BATH](https://www.houzz.com/hznb/projects/refined-rustic-master-bath-pj-vj~7139296)
  - Location: Not specified
  - Photos: 11
  - Description: The original 1982 master bathroom had gold & dark brown colonial décor that needed updating for the current owner. A custom shower was also requested instead of the existing tub. An inspiration photo was supplied to focus the design direction of the new space. Here is how we helped: --removed all original fixtures and finishes --installed custom shower base & walls with custom niche --selected and installed rustic wood furniture style vanity --custom made recessed medicine cabinet door to match…
- [Opening the KITCHEN](https://www.houzz.com/hznb/projects/opening-the-kitchen-pj-vj~7139222)
  - Location: Not specified
  - Photos: 9
  - Description: This home still had the original 1926 cabinetry and layout. The current homeowners were looking to open up the space and modernize the layout. More storage and countertop space were needed but staying close to the budget was requested. The homeowner also volunteered to help with demo of room & chimney. Here is how we helped: --remove wall between kitchen & living room --reframe opening and prep floor for new LVT --install 2 tone cabinets (allow for soffit of upstairs bath) --install custom lamin…
- [Reshaping the KITCHEN](https://www.houzz.com/hznb/projects/reshaping-the-kitchen-pj-vj~7139360)
  - Location: Not specified
  - Photos: 9
  - Description: Time 2 Remodel, LLC. May 22, 2022 · Reshaping the KITCHEN The original 2000 builder grade cabinets and layout needed modernizing for the new family. The cooks often felt trapped in the kitchen when entertaining and lacked countertop space. The homeowners were also looking for modern features of slow close drawer/doors and granite tops. Other updates of a new style & color of cabinets were requested. Here what we helped update: --reduced half wall & opened up walkway to living room --redesigned l…
- [Multi-purpose BASEMENT room](https://www.houzz.com/hznb/projects/multi-purpose-basement-room-pj-vj~7139326)
  - Location: Not specified
  - Photos: 8
  - Description: The homeowners were looking for multiple uses for their small basement room. The space was needed for a guest room, work out room and movie viewing area. An egress window was added to help make it a guest room and bring additional light into the room. Here is how we helped finish this space: --cut concrete and added egress window well with new window --removed drop ceiling and built soffits for drywall (including niche for hiding screen) --painted existing paneled walls to help with budget --ins…
- [MASTER BATH from rough to diamond](https://www.houzz.com/hznb/projects/master-bath-from-rough-to-diamond-pj-vj~7139249)
  - Location: Not specified
  - Photos: 8
  - Description: Already 20 years old, this 2002 master bathroom was dark & confining from the beginning. The space was a diamond in the rough and just needed some slight changes in the floor plan and new fixture selections. Storage and better lighting was were we started and an inspirational photo lead the way. Here is how we helped: --removed all original fixtures and materials --cut down existing tub wall to approximately half to open up room --installed new LED lighting, maple thatch stained cabinetry, LVT f…
- [BASEMENT Transformation](https://www.houzz.com/hznb/projects/basement-transformation-pj-vj~7139191)
  - Location: Not specified
  - Photos: 8
  - Description: BASEMENT transformation The existing storage basement in this 2013 home had been prepped for finishing when built but never completed. The current homeowners were ready to finish the basement to use as a family space & guest suite. The goal was to make it feel like part of the rest of the home. Here is how we helped: --finish framing rooms for bedroom, bathroom & main room --install electrical, plumbing & heating as needed for new space --finish drywall & install LVP flooring (LVT in bath) --des…
- ["Nouvelle Belle" KITCHEN](https://www.houzz.com/hznb/projects/nouvelle-belle-kitchen-pj-vj~7139210)
  - Location: Not specified
  - Photos: 11
  - Description: This beautiful new kitchen started as a 1973 closed off space with dark oak cabinetry and laminate countertops. The homeowner requested it be opened up to the dining room, add storage and modernize the appearance. Here is how we helped: --removed part of the wall between kitchen & dining room --replaced cabinets with painted cabinets --replaced countertops with quartz --added tall storage cabinet and open shelving --included walnut butcher block snack bar The beautiful result adds versatile stor…
- [BASEMENT Space to Entertain & Arcade](https://www.houzz.com/hznb/projects/basement-space-to-entertain-and-arcade-pj-vj~7139349)
  - Location: Not specified
  - Photos: 11
  - Description: The original open 1978 basement was used for a laundry and storage space but showed potential for expansion of living space. The new homeowners were looking to space to entertain that included their arcade collection. A layout was planned, and selections were made. Here is how we created the space: --layout and frame walls including angles --install electrical & heating as needed, including speakers --drywall, paint and install floating floor over painted concrete --install bar cabinets, quartz…
- [Improving the MASTER BATH](https://www.houzz.com/hznb/projects/improving-the-master-bath-pj-vj~7139253)
  - Location: Not specified
  - Photos: 7
  - Description: The original 1917 sleeping porch had been turned into a DIY bathroom a few decades ago and it was time for a professional remodel to improve several features. The current homeowner was looking for an updated, warmer space. Here is how we helped: --demoed room back to original framing --upgraded/ moved plumbing to improve layout --upgraded/ added spray foam insulation --installed custom tile shower & door --reused vanity/ installed new top & vessel The homeowners loves how the new layout has open…
- [Stylish Basement BATHROOM](https://www.houzz.com/hznb/projects/stylish-basement-bathroom-pj-vj~7139239)
  - Location: Not specified
  - Photos: 7
  - Description: The new young homeowners wanted to add a guest bathroom in their 1984 basement. They also wanted to incorporate their fresh style and and welcoming details, but needed help putting it all together with their busy schedules. Here is how we helped: --framed walls & broke up concrete for plumbing --installed electrical, finished & painted walls --laid out custom herringbone accent & shampoo niche --included a white shaker furniture style vanity --installed matte black fixtures & accessories The fin…
- [KITCHEN remodel again](https://www.houzz.com/hznb/projects/kitchen-remodel-again-pj-vj~7139175)
  - Location: Not specified
  - Photos: 7
  - Description: This wasn’t the first time this 1976 kitchen had been remodeled, but it was time to update again! The homeowner liked the layout but wanted the cabinets replaced to brighten and improve organization. Since the LVT flooring was new, the layout and color needed to compliment the flooring. Here is how we helped: –removed existing oak cabinetry and laminate countertops –protected the existing flooring and prepped walls –updated electrical to add LED can lights and undercabinet lighting –installed ne…
- [Completing the BASEMENT Remodel](https://www.houzz.com/hznb/projects/completing-the-basement-remodel-pj-vj~7139331)
  - Location: Not specified
  - Photos: 10
  - Description: The homeowners had already started the remodel of their 1950’s basement when they asked us to help finish it. A finished main room was requested including a new fireplace, built in shelving and painted ceiling. We finished the demo of the space and then began putting it back together per the products selected. Here is how we completed it: --framed and insulated the new walls for drywall --painted ceiling black along with the boiler pipes --installed LVP low maintenance flooring --selected and in…
- [Adding Character to a New Kitchen](https://www.houzz.com/hznb/projects/adding-character-to-a-new-kitchen-pj-vj~2469817)
  - Location: Not specified
  - Photos: 18
  - Description: This 1960's kitchen on the north side of this home had original cabinets and was dark. Brightening the kitchen with new cabinetry and cabinets was requested to go along with the existing new stainless appliances. The homeowner also wanted to add character to their space. This is what we added: --LED lighting on a dimmer to brighten yet have control --tile on wall to mimic brick chimney --reclaimed wood shelving with handcrafted metal brackets --continued medium oak wood flooring into dining/kitc…
- [BASEMENT Retreat](https://www.houzz.com/hznb/projects/basement-retreat-pj-vj~6199618)
  - Location: Madison, WI
  - Photos: 8
  - Description: What a joy it has been to have this basement space while this family of 4 has been staying at home! The original 1951 basement was dark and utilitarian in design. A guest suite and family space were requested to expand the living space and welcome visiting family. Here is what we accomplished: --framed and dry-walled large open room for multi-use --moved existing plumbing and duct work in ceiling/ floor as needed --created double entry bathroom with shower --added egress window to brighten new g…
- [Kitchen with Added Flow and Function](https://www.houzz.com/hznb/projects/kitchen-with-added-flow-and-function-pj-vj~1471448)
  - Location: Not specified
  - Photos: 10
  - Description: Sometimes a kitchen just needs more space to flow properly. The original home had an add on garage and family room floor plan that caused the new owners to go outside the garage before entering with groceries. The kitchen lacked storage, counter-top space and was a dark hallway with no eat in dining. By bumping out the kitchen approximately 6 feet and moving the backyard entry to the family room, the garage entry could now be included in the kitchen. (left of kitchen sink) Part of an original wa…
- [Kitchen Memories Transformed](https://www.houzz.com/hznb/projects/kitchen-memories-transformed-pj-vj~6199993)
  - Location: Madison, WI
  - Photos: 8
  - Description: When her childhood home needed an updated kitchen, we looked at several design options. This 1923 home also had the challenge of being located in a historic neighborhood so the existing front facing window could not be altered. To incorporate the character of the home, several design details were also included ie: glass doors, subway tile, wood floors etc. Here is what makes up the new kitchen: --removed over-sized entry closet for added kitchen square footage --moved sink and appliances for bet…

[See all 66 projects](https://www.houzz.com/professionals/design-build-firms/time-2-remodel-llc-pfvwus-pf~59018042)

## Ideabooks

- [Wish List](https://www.houzz.com/ideabooks/89969427/list/wish-list) — 1 idea

[See all 1 ideabook](https://www.houzz.com/ideabooks/users/cdimmig)

## Community Q&A

**Q: What type of stain used on cabinets?** *(in Photo Questions)*

lyoung59@gmail.com

A: They are Kemper cabinets in Maple wood with wheat stain.

**Q: wall color** *(in Photo Questions)*

A: Hi,  The paint color used is Benjamin Moore Shaker Beige HC-45.  Hope this helps!

**Q: Dimensions of room and shower stall** *(in Photo Questions)*

Please indicate dimensions of this bathroom and size of shower stall, details of pedestal sink too.  I like this simple design and clean feeling from the wall color and floor with white porcelain fixtures.

A: Sorry it took so long to answer, the shower is 48&quot;w x 36&quot;d.  The room is approximately 4ft x 8ft.

**Q: Great basement.** *(in Photo Questions)*

Did you use roll type carpet or carpet tile? Any problems with the carpet and dampness? Thank you.

A: Sorry it took so long to answer,  this is rolled carpet with a moisture resistant pad.

**Q: Paint color** *(in Photo Questions)*

What paint color did you use for the basement remodel? I have been trying to find a creamy yellow.

A: sw6673 banana cream from sherwin williams

**Q: Where can I buy the pocket door?** *(in Photo Questions)*

A: We had it custom ordered thru our local lumber yard and then painted it on site.

---

*Source: Houzz professional profile. Reflects the profile as of 2026-08-24.*
