
Castle Rock Primary Master Suite Bathroom Remodel
Transitional Bathroom, Denver
This is the rendering of the bathroom.
We reconfigured the space, moving the door to the toilet room behind the vanity which offered more storage at the vanity area and gave the toilet room more privacy. If the linen towers each vanity sink has their own pullout hamper for dirty laundry. Its bright but the dramatic green tile offers a rich element to the room

Other Photos in Castle Rock Primary Master Suite Bathroom Remodel
What Houzzers are commenting on
Debbie Keehne added this to Bathroom RemodelDecember 3, 2025
Linen Closet

After: By removing the surround, Bagley Catlin was able to relocate the toilet room door to the wall across from the...