Software
Houzz Logo Print
ckg54

Suggestions on basement floor covering

11 years ago
We remodeled the basement in our 85-year-old house in 2010. The contractor poured a new concrete floor -- to provide a level surface - before installing 20-by-20 ceramic tiles. I don't believe they put down a sub-floor or other barrier before setting the tiles. After our frigid winter last year, I noticed tiles in the middle of the floor beginning to 'tent'. Repairs are needed. Should the contractor have installed a sub-floor first?Should we spend the money to repair the existing floor that may have been improperly installed? Or should we start from scratch and have new flooring properly installed? We don't want to carpet the room, preferring hard-surface flooring that is easily cleaned. What would be the best solution?

Comments (4)