Software
Houzz Logo Print
arky217

Grounding a submersible pump

13 years ago

I just had a well drilled with a PCV casing. The well driller said to tap into the ground wire at the well head and run the tap to a driven ground rod near the casing.

In other words, the ground wire from the service panel should go to a separate ground rod (not the ground rod for the service panes) located at the well head, and then continue on down the well to the pumps ground wire.

Does this sound right ?

Comments (3)

Sponsored
AIS Renovations
Average rating: 4.5 out of 5 stars15 Reviews
Custom Craftsmanship & Construction Solutions in Franklin County, Ohio