Software
Houzz Logo Print
macybaby_gw

Countertop is almost home!

15 years ago

Our Soapstone is now sitting in a warehouse only 60 miles away. Tomorrow Dh is hooking up the stock trailer and we'll be making the trip in to pick it up. He's got some snow removal to do first so he can even get to it (thanks to the New Years storm we got).

And then, if all goes well, we'll start installing the countertop this weekend!!!!!

I'm not sure if I'm more excited about the counter-top, or the thought of getting my new kitchen sink off the dining room floor -it's been there for almost two months now.

And in case anyone is wondering - I'm still painting cabinets. I get up aroud 3 am, paint for an hour or so, then go to work. After dinner, I paint again for an hour or two - then repeat. It's slowing getting all done.

We've got all the components for the boxes cut, sanded and laying in assorted places around the house in different stages of paint. Things are finally looking more done than not done.

Cathy

Comments (10)

  • 15 years ago

    That's great, so exciting for you. Good timing as it looks like another big storm will be moving across next week.

    You are really working hard there with the painting and all. Just think how it will be when it's all done.

    My sink was in the dining room for more like two years than two months so I do know how it feels to get that stuff installed.

  • 15 years ago

    Yay! Can't wait to see them.

    As another northeasterner who DIYed her soapstone counters in January - I sincerely hope you have a barn to work in. Soapstone left outside in January is cold. Bone-chillingly-can-barely-touch-it cold. Take-your-breath-away-stop-your-heart cold. And soapstone cut inside, even tented with a shop vac going, will create ridiculous amounts of dust. Ask me how I know. Trust me soapstone dust is about 10 times worse than drywall dust. 2 weeks later, it'll still be settling out of the air.

    Oh, and remember to use a leave-in deep conditioner treatment before you fabricate your counters. The dust is very drying and you'll end up with a head full of split ends if you don't.

  • 15 years ago

    Our soapstone is prefabricated. DH decided he did not want to mess with it, even though we have a very simple layout. The total cost was $1700 with them doing all the work and us doing the install.

    I don't think I'll be too upset that I'll be missing out on the soapstone dust experince though!

  • 15 years ago

    How exciting!

    Our soapstone is due to be installed tomorrow (crossing fingers for no delaying issues.) It's not diy, but we did have to move a whole lot of snow (ice, glacier, ...) too, to make a straight path from the driveway up our back porch stairs. Apparently this stuff doesn't bend around corners well.

    Wishing you all the best with the last leg of the journey and the install.

  • 15 years ago

    Ooh...even better! That means we'll get pictures right away. I love ogling the more exotic soapstones.

  • 15 years ago

    Definitely take pictures. You seem to have a lot of photos of your renovation journey already...some of the soapstone's trip to its new home would be very memorable.

  • 15 years ago

    I can vouch for the dust. We cut and finished 2 of the 6 pieces for our kitchen last weekend. It was easy but VERY dusty. Hard to get your hair wet in the shower after. But it's so pretty in my kitchen that I would do it all over again....hey wait, I still have four more pieces to cut and finish. :)

  • 15 years ago

    I'm excited for you! : )
    Hope the weather participates in the process.

    Pepper
    ~ Cabs are at the Finishers. Wheeee!

  • 15 years ago

    Things are going to be a bit delayed. We got about 8 miles from home and decided it wasn't a good day to be out on the road with the trailer. Only problem - we had another five miles to go to get off the interstate. Turns out though the side roads weren't all that bad, the interstate was glare ice. When my husband gets nervous, I know it's bad out. We got off and came home on the highway.

    We got the rig safely home and called to find out about having it delivered to our home instead of us picking it up. With the cost of gas, it's only about another $100. Right now DH says that looks acceptable (though he didn't feel that way when I ordered it).

    So hopefully we'll have it before next weekend. The weather isn't looking real good all week so we'll see.

    This will give me a chance to get more of the cabinets assembled and mounted to the walls, which makes for much less to be walking around.

    Gotta look on the bright side! Now I have to go make Cookies for DH - for all the work he did getting the trailer out of the snow even if we couldn't make the trip.

  • 15 years ago

    That's disappointing for you, but better to stay safe. The next storm looks like a big one too. Once you have it done, you'll enjoy it for a long time.

    On the bright side, you have a few more days to get painting done.