90% finished, small diy kitchen

18 years ago

I'm thrilled with the way the our kitchen has turned out, no more drafts in the winter, drawers that open, windows that open...

We did all of the work ourselves with the exception of the electrical updates and a few plumbing repairs. It's not a big kitchen, the cabinet run is 7' x 13' and the overall kitchen including the powder room is about 13' x 13'.

I figured if I waited til we were 100% finished I'd never post - so here goes:

Before - most of these were taken during the home inspection before we bought the house..and during the stove replacement before we moved in:

After:

The inspector:

This is where the microwave cart goes, I'm replacing it with a freestanding hutch cabinet in the next month or so.

Details:

Cabinets - Kraftmaid praline finish

Countertop - Giallo veneziano

Floor - Natural Cork - Miranda Chocolate

Backsplash - Honed and filled travertine with white onyx listello (all from Lowes)

Lighting fixtures - from Lowes

Paint - Blue Sail (Valspar)

Still to do:

Replace refrigerator with a black one - hopefully by June 2008

Install cabinet hardware - sitting in a bag in the livingroom (Amerock satin nickle pulls and knobs)

Reinstall moldings around flooring

Finish window treatment over sink

Finish installing crown over cabinets

Replace cover over baseboard heater

We're a family of two (with two cats) who spend more time at work during the week than at home so this process has of course taken longer than we'd like it to. But then again don't most projects.

Comments (15)

  • 18 years ago

    Congratulations on your kitchen! What a huge difference from your "Before." You must just love it - very impressive that it's a DIY!

  • 18 years ago

    Good job envisioning what you could do with that kitchen. I've never dealt with plaster and lathes SP?). Did you replaster, or put up drywall?

    Also, on my monitor the two after pics have very different colorations, in the top one, the walls look aqua, and the cupboards have a natural maple look; in the bottom one, the wall is sky blue, and the cupboards have a 'toffee stained' maple look. Which is correct?

  • 18 years ago

    raehelen - the cabinet color is Praline which can best be described as a dark honey - not Toffee. The final after picture probably gives the best representation of the wall color, it's in the neighborhood of sky blue with a hint of green in the undertone. The flash on my camera does unpredictable things to the colors. We put up drywall over the insulation, my husband was against taking out the lathe so the insulation is stapled to the lathe and studs - it was a compromise but it truly beats what was there before...nothing!

  • 18 years ago

    Love it! Of course, I put in shaker style autumn maple and black appliances, so I have a bias. You took it down to the lath by yourselves? How brave. Great job!

    And thanks for doing it before you are 100%. Too many of us never quite finish and never post. I'm looking closely at your finish pieces on top of the cabs because I didn't quite make it to my ceiling! Your beadboard trim is great too.

    Give the inspector a belly rub for me!

  • 18 years ago

    Looks great! But I would not trust that inspector. She looks like she'd pass anything.

  • 18 years ago

    janwad - the tops are basic crown, since the cabs are shaker we wanted a finished look but still simple.

  • 18 years ago

    Very nice job! Homey and stylish!

    I hope you pay the inspector well!

  • 18 years ago

    bklyn, That is absolutely beautiful. I am utterly in love with your floor - stunning. It looks wonderful with your lovely cabinets and absolutely amazing against the white and blue of the walls. Absolutely beautiful. I can't believe you did this yourself. Amazing.

    And your inspector is adorable. He looks like he so approves of the plastic sheeting there.

  • 18 years ago

    Beautifully planned and executed! Congratulations.

  • 18 years ago

    Just wanted to thank you all for your for your compliments and to give you an update on how the last 10% is coming along.
    We started installing the hardware and discovered we needed longer screws for the drawer pulls...so they haven't been done yet.

    The hutch I ordered to replace the microwave cabinet arrived. Decided to wait until we get a new microwave to make the cutouts in the the back panel to nestle the microwave more snugly. It's a micro/convection combo so there's more appliance on the back end than there would be with a standard microwave.


    I also changed out the wall clock above the unit, this one fits better.

    Still have more to do but I feel like we've entered the home stretch.

    Of course now that I've gotten used to having open space in the middle of the kitchen I don't want to put the kitchen cart back - it doesn't coordinate with the new decor....but I'll tackle that in another post.

  • 18 years ago

    Very nice. How long did it take you to do everything?

    And, Fori, I beg to differ about the inspector. We find that the three "inspectors" in our home are very particular! :)

  • 18 years ago

    sail-away - thank you. It's taken us about 4 months to get to this point, we took a 3 week break for the Christmas holidays.

    The other half of the inspection team is camera shy but her main concern is making sure the food storage is adequate.

  • 18 years ago

    bklyn2pok: Very nice job! I just wanted to give you a word of advice about installing your drawer knobs: you don't need longer screws necessarily, you just need to countrsink the screws from inside the drawer. That's the way I've always done it.

    By the way, where does your fridge go? Couldn't see from the pictures.

  • 18 years ago

    It's waaaaaaay easier to buy longer screws for a couple of bucks at any hardware store. Lots less work than countersinking for using the "came with" ones.

  • 18 years ago

    mapletex - longer screws were easier and one less reason to fuss with DH. The fridge aka "the white elephant" is in a corner alcove, it's due to be replaced in a couple of months.


    We're keeping it covered with magnets to hide it until then.

Sponsored
NME Builders LLC
Average rating: 5 out of 5 stars2 Reviews
Remodeling Company in New Albany, Ohio