Software
Houzz Logo Print
whitebeard

is quote high?

17 years ago

I have a quote from a contractor for central A/C. Summer house in a remote location with high humidity but only about 20 days/year that are hot enough for A/C. House has a 9-year old forced hot air gas central heating system (put in by the same contractor), already set up to receive a coil.

The quote was for installing a 13 SEER 42,000 BTU (3.5 tons) compressor, R410 system, CAPF486 coil, a pre-fab concrete pad and a vanilla digital thermostat.

Total including labor (but *without* delivery -- as I said, this is a remote location) and *without* electrical wiring (I have to hire my own electrician) totals about $4,400 (it was not itemized). This seems high, considering what have seen for the cost of the major components. Am in dealing with another $300/hour tradesperson?

Comments (2)