contracting etiquette

18 years ago

I've received a bid from a general contractor that I'd like to work with on my kitchen and bathroom.

The electrical portion appears to be quite high for what I have in mind. I think that the contractor has added a lot of "risk" to that area because his electrician has not seen the existing service panel.

Would it be acceptable practice for me to ask the general contractor to go fixed price on everything but do the electrical portion as time and materials (loaded with his overhead/profit)?