Software
Houzz Logo Print
joanneswimsct

Getting ready to 'dive in'! Contract Thurs!!

18 years ago

FINALLY we are meeting w/ our PB to sign a contract this Thurs evening!!! It has been a very long road to get to this point but I think we've covered all of our issues w/ the neighbors, insurance, etc. We are going w/ vinyl 18 or 20x38 rect. Nothing fancy as we've sunk a ton of $ into our retracable pool enclosure. Our intent is to swim year round but if it's too expensive to heat in the winter, at least we will be able to swim for 8-9 months here in CT. We will plan on roughing in for an HVAC system for down the road but the system can wait as other things are more pressing. I will post the contract for you experts to read before we sign but is there anything we need to be aware of or ask him while he is here on Thurs? What I really like about this builder is he only does 1 pool at a time and uses the same guys on all of his jobs. He has been in business forever and has known his guys since high school. He has a great reputation and has built many of my friends' pools. I'm still stuck, though, between sand and DE for filtration and salt vs traditional chlorine for sanitation. I want convenience but really need to save $$. In the long run, what do you experts feel?? With an enclosure, I can keep evaporation down thereby saving $ on chemicals as well as heat. We will use a solar cover as well. If it makes any difference, we have septic and not sewers... I will also be roughing in a small bathroom w/ toilet and shower. This room and the utility room will be built w/i the enclosure. The enclosure at the end will measure approx 30' wide. We will use about 5' of depth to box in the rooms. I need 5' of decking minimum around the whole pool for state code for the swim lessons; the length of the enclosure is 54'. Unfortunatley, no diving board and probably no slide due to homeowner's insurance... Anyway, let me knoiw if there is anything I should be asking for or on the look out for for Thursday.

Thanks so much!!!

joanneswimsct

Comments (2)

  • 18 years ago

    I think the most important thing is that you do not pay them till they are done. Also, if the best you can do is payments as they go, make sure they are 25-25-25-25% and not 25-50-20-5%. Best thing would be to negotiate a contract where if they are done within 60 days less 2% of purchase price and a schedule of less an additional 1% for every 10 days after that. Be willing to choose a different pool company if they can't put their money behind their schedule and their committments. But thats the voice of experience and a guy with a pool in the hot summer so I know its hard. ;)

  • 18 years ago

    Good advice, Barco
    I know he wants $3K as a down payment then 30% at the start, 30% at the walls, 30% at the liner and 10% at the finish. The time line may be difficult for all concerned as he will be working in concert w/ our enclosure installation. They are coming in from Canada and will be installing at the wall stage of the pool. We decided to install prior to the liner in case someone drops a beam or panel that Heaven forbid rips the liner or shatters in the water! Normally the PB has folks swimming a week after the dig but it'll take at least a week to install the enclosure so I'm guessing 3-4 weeks from start to finish. So far we have a rough idea of what we'll be getting:
    Price includes:
    labor, Fort Wayne Steel/lifetime guarantee 14 guage 235 zinc galvanized coating and 5" flange, deck bracing, wall foam, 8' walk-in step; 4 tread w/ 2 spa fittings, choice of liner; 20 yr warranty 28 mil wall w/20 mil floor, 2" concrete aluminum reciprocal coping, concrete steel reinforced 3'x7' filter pad, 2" plumbing and 2" Jandy valves, pool timer, we think all Hayward prods, vermiculite/cement floor, 2 wide mouth skimmers, 2 low suction lines, 5 return lines, 3 heater zones, reserve plumbing, 1-3 step ladder, 1 set handrails, pool alarm, safety line, vacuum kit (16' telescopic pole, vacuum adapter, vacuum head and hose), thermometer, wall brush, hand leaf skimmer, test kit, starter chems, pool school plus all dig and backfill time is included. A sanitation company wants our sandy soil so we will try to barter w/ them to get a hookup to our septic for the bath house. The rough cost for the above is $20K. He will orchestrate the electric, plumbing, fencing, foundation for the enclosure and gas as well as the decking toward the end of summer. I'm sure there is a finder's fee involved but we are much too busy to do it ourselves so I'll pay the extra! Besides, he's been working w/ these guys forever so they know the perfect timing.
    I'll let you know how things go Thurs evening!!
    Thanks so much for 'listening' and for your input!
    joanneswimsct