Software
Houzz Logo Print
otowncyclist

Orlando complete renovation

17 years ago

I've been reading this forum for a few weeks while my pool renovation is finally getting under way. My 15 y.o. pool was beginning to show its age from both a structural and aesthetic standpoint. The fibergalss spa was very 80's looking and not in great condition, the kool deck surface was showing cracking and staining, the waterline tile was out of style, and the marcite finish was starting to stain and pit. It was time for a makeover.

Pool specs: 30x15 (3.5' to 6.5' deep), 800 sq ft deck (concrete w/ kool deck), marcite finish--typical mid 90's Florida pool.

Here's what we're doing:

-Removing the spa and finishing off the existing raised beam to accomodate 2 24" sheer descent water falls.

-Pebble Tec Caribbean Blue interior

-African Blue 6"x6" porcelain waterline tile

-Cream brick coping

-Installing thin pavers over the concrete (Bent Creek color)

-7 panel solar heating system

-Colorlogic LED light

-AquaRite Salt Chlorine Generator

To date they've demo'd the spa, installed the sheer descents, transformed the raised beam into a "bench" capped with the coping material, installed the tile and coping. Just waiting for the pavers to go in next week and the Pebble Tec to be done soon thereafter along with the LED, SCG, and solar system.

Our kids (5 and 3) are excited to get back in the water...hopefully by July 4th. BTW Dixie Pools is doing the renovation which set us back $24K.

I'll post some before and "during" pics later.

Comments (10)

  • 17 years ago

    sounds very nice
    how about a heat pump in place of the solar?

  • 17 years ago

    We currently have a gas heater for the spa that we're getting rid of and I'd rather not replace it with another fossil fuel consuming heater. We think the solar is a great option for us due to the abundant sunshine in Orlando. All indications are that it should keep our pool 80 degrees or warmer from March-November. I can handle an 8-9 month swimming season.

    They're installing pavers as I write this.

  • 17 years ago

    The pavers went in and look great. This week was busy at the house. In addition to a roof replacement, the solar heating system was installed along with the SWG, Pebbletec, and LED light. They did the acid wash today and the pool is filling now. However, I was surprised to come home Monday and discover a Jandy AquaPure 1400 SWG installed when the contract clearly stated a Hayward Aquarite SWG. Should this be concerning? It appears the Jandy is a more expensive unit...does that translate into quality? I plan on posting some photos of the completed project...if I can figure out the process.

  • 17 years ago

    Pool has been complete for a week and we've already enjoyed it a few times. The 2 sheer descent waterfalls look nice and operate well. I was worried that my lone pump would struggle with the 2 sheer descents plus solar system, but no problems at all.

    Water color with Caribbean blue pebble tec is exactly what I hoped it would be. Cleaning tons of pebbles out of the cartridge filter on a daily basis, though. Supposedly it loses pebbles for about a month?

    The Color Logic LED light is plenty bright and has a nice variety of colors and light-changing shows.

    PB adding salt for the first time today. Said they needed it to run for a week before adding salt.

    The only problem we have is that the grount between the tile and coping has some orange (rust-like) staining in some locations. PB tried to rub it off with acid and the like but he ended up wearing right through the grout. It looks like something is bleeding through from behind. They may end up having to replace the entire grount line around the pool. Hope they don't have to drain the pool...

  • 17 years ago

    A few pics of before renovation
    {{!gwi}}
    {{!gwi}}
    {{!gwi}}
    {{!gwi}}

  • 17 years ago

    Few pics before renovation

    {{!gwi}}

    {{!gwi}}

    {{!gwi}}

    {{!gwi}}

    Finished Product. To recap, we used Bent Creek thin pavers over the existing concrete slab, Caribbean Blue Pebble Tec and brick coping. We're real satisfied with the finished product.

    {{!gwi}}

    {{!gwi}}

    {{!gwi}}

    {{!gwi}}

    {{!gwi}}

    {{!gwi}}

    {{!gwi}}

    {{!gwi}}

  • 17 years ago

    Bravo! Very nice! Love the pavers and of coarse that gorgeous PT finish!

  • 17 years ago

    Looks great, my PB is installing an Aqua Rite SWG. I understand that these are will built and I have a 5 yr warranty on it. Look at out blog , "Our New Pool Build in Jacksonville, FL"

  • 17 years ago

    Otowncyclist, can you tell me what solar system you are going with and approx price? I am thinking about solar and or heat pump.

  • 17 years ago

    brentr
    We went with a system from Central Florida Solar in Casselberry. We actually didn't have much of a choice as they're the provider my PB uses. As you can see, it's a 7-panel system and includes automation (you set your desired temp and the system automatically engages or disengages the solar automatically) and a solar cover. I'm not sure of the exact price, but I know if was below $4K. We decided to go with solar over heat pump for both environmental and long term cost reasons. I figure that if I use the solar cover when the temps start to drop a bit, I should be able to maintain 80 degrees for 9-10 months a year...plenty long of a swim season for us. It's nice knowing I'm burning no fossil fuels to keep my pool warm.

    As for the SWG, we were supposed to be getting an Aqua Rite, but a Jandy Aqua Pure 1400 got substituted at the last minute...not sure the reasoning. I've really got nothing to report on specific brands at the moment because it's only been in operation for 2 weeks, but I can say that the water is silky smooth. I think I'm going to like it.