Software
Houzz Logo Print
samat40

urgent

19 years ago

Our pool was filled four days ago, but the electrician never showed up to hook up the equipment. How long is too long to go without filtration? Our PB is out of town til Wednesday.

Comments (11)

  • 19 years ago

    You shouldn't go more than three days. If you have plaster, you should be brushing it two to three times a day, every day, to get rid of the plaster dust. And, or order to get rid of it, the filter needs to be running. Is EVERYONE at your PB's company out of town until Wednesday?

  • 19 years ago

    We've been brushing, but no electrician. And Yes, our pool builder is it. We have no contact numbers for our electrician. The PB left a number, but it doesn't seem to be the right one. I think the electrician was supposed to come on Thursday. The PB may think that he showed up. I'm clueless at this point.

  • 19 years ago

    Here's an idea...

    Read the installation instructions (no doubt found online) of the plaster used.

    If the instructions allude to the water being at correct levels, or being filtered, etc (surely it will indicate this)

    Then call his competitor's, independent electricians, etc until you get someone to come fix your stuff... and tell your PB that you did this in order to PROTECT HIM from having to grind out your plaster and re-do this whole step. Then take steps to make your PB pay the third party (either by holding out final payment, or whatever.)

    Of course, leave him a message today that you're doing this... so hopefully he will respond before you have to do this.

    Good luck.

  • 19 years ago

    Thanks. I don't know exactly what plaster this is (I know...how can I be on this forum and be so poorly informed! -- This has been a 200+ day project, and frankly I think my brain has blocked all pool related data to save me from future therapy sessions...) but I did look at a few sites and I see that there is a acid start-up that does not require filtering. The acid dissolves the dust. Maybe they are doing that? They did put acid in there. That is one thing I DO know. I still think this thing needs to be filtered sooner rather than later.

  • 19 years ago

    your best bet would be to hire an outside contractor, electrician or pool repair co and back bill the contractor. Send a certified letter of your actions now to cover yourself explaining his stupidity and your extreme need.

  • 19 years ago

    One other point...

    Did he say "when" the electrician would be there?

    Has that time passed? If so, just one more reason you need to protect you and him, by helping him... by hiring someone to do his job... (that he said would happen on X day.)

    Repair guy is right, put a certified letter in the mail tomorrow explaining your actions.

  • 19 years ago

    My last advice...

    Send the letter advising him of your efforts to get the job done for him, in the interest of protecting him and you.

    As you make your phone calls to others, document each phone call and the results. (You know, there's a good chance you won't be able to get anyone to do this in such short notice.)

    The letter, along with your documented effort to fix this situation may very well serve you well if you sustain damage to your plaster.

    When you're insisting that he "re-do" your plaster, you will have your proof of his lack of performance, and your proof of what you did to try to help him... then it will be his turn to perform.

    Good luck.

  • 19 years ago

    Please post your PB's company name so others may avoid. That is unacceptable. Our elecricity was connected months before plastering and indoctrination was 2 days after it filled.

  • 19 years ago

    The pool is fine. It is a dark blue/gray and looks good with the 15 tons of moss rock we have behind it. It is mottled, but not in a way that detracts from the overall look of it. we do get a little sand off the flagstone coping but that gets sucked up by the cleaner. I don't want to post my builder because he did furnish a good end product for the price we paid, plus the weather here and our sloped yard added to the difficulty. I will post pictures soon.

  • 19 years ago

    You can do an acid start up. You need to add enough acid to drop the alkalinity to zero. This will eat up the plaster dust with lost of brushing. After all the dust is gone you need to bring up the alkalinity with sodium bicarb. Do not start the equipment until the ph is above 7.2. The acid might have to be in the pool for 10 - 14 days. We do acid start ups on dark plaster pools with great results.

  • 19 years ago

    How did they get the final inspection and sign off on the building permit to allow water to be put in the pool before the electrical was finaled? In most locations you must have a final inspection before water can be added to the pool so that you don't swim until they are sure all is correct!