After getting a few quotes we've narrowed it down to the final contender but we're still having a bit of sticker shock! This is considering we haven't factored in all the additional decking we want or re-fencing our property. I'd love some opinions on the quote we've received.. and if there are any areas where you think we should be getting (or asking) for more. We are located in NJ

This quote is for a 600 sq. ft gunite pool. Custom shape )3 1/2 - 7 ft depth)

Building permits, structural plans & topographical survey

Excavation, removal of soil and or grade around pool area

Safety construction fence

Concrete Shell with 'lifetime structural guarantee' 4000 PSI

6" band of frost proof tile

White marble interior finish

Four shallow end steps

Custom built swim out love seat

2 HP DE 60 Jandy filter

Energy Saving time clock

1 surface skimmer, safety suction main drain, 2 directional inlets (all 2" PVC pipe)

Jandy Salt System

1 500 watt pool light

Saftey ropes, floats with recessed hooks

Leaf net, backwash hose, pole, vac head, brush, test kit, thermometer

3 ft concrete walkway around entire pool

50 sq foot thermal ledge

Bluestone 12" coping

Polaris 280 w/ booster pump

400,000 BTU Heater

Electric up to 150' ($5 each additional ft)

Gas up to 40' ($10 each additional ft)

The quote for everything listed above is $38,000

The only thing we don't have factored in is a solid cover (the company only offers mesh covers and he needs to source out a solid cover for us... or we'd find one on our own)

Thank you!

Comments (13)

  • 19 years ago

    Don't know the costs for your area but I hav a problem with the 2 returns on a 2HP pump. Seems like a major backpressure situation to me.

  • 19 years ago

    One additional question regarding the payment schedule.
    I've read so many reviews with people voicing concerns about paying before final inspection. The contract shows the following payment schedule. Would you ask for any of this to be changed or is this pretty normal?? This company does all the work themselves (they do not subcontract)

    40% due at excavation
    55% due at concrete application of shell
    5% minus $250 due at application of interior finish
    $250 due upon securing CO

    Is it safe to only have $250 outstanding at the completion of this project?

    Thank you!

  • 19 years ago

    Hello Mrs. Mack,

    I am in NJ as well and we recently signed our contract. I thought I'd let you see my quote to compare, it's not exactly apples to apples but also being in NJ I thought it might help some.

    700 SQ. FT. POOL (ANY SHAPE)
    RAYPAC 400,000 BTU HEATER
    40 SQ. FT. SPA W/8 JETS & LED LIGHT
    JANDY PDA-PS8 WIRELESS POOL & SPA REMOTE
    96 SQ. FT. SUNSHELF 6" DEEP W/ UMBRELLA SLEEVE & BUBBLER
    6 JANDY DECK JETS
    POLARIS 380 AUTO VACUUM SYSTEM
    AUTOMATIC IN-LINE CHLORINATOR
    500 SQ. FT. TEXTURED CONCRETE
    TEXTURED CONCRETE CANTILEVER COPING
    60 LIN. FT. GAS LINE W/HOOKUP (10$ additional sq. ft.)

    All Electrical
    Custom Pool Design And Pool Layout
    Engineering Plans/Building Permit
    Normal Excavation/Soil Removal
    Crushed Stone Base
    ½" Steel REBAR Reinforcing
    Electrical Bonding
    4000 LB. MIN. PSI Gunite Application
    Commercially Rated 60S/F D.E. Filter
    Whisper-Flo Pump
    Automatic Time Clock
    Six Way Multiport Valve
    2" Schedule 40 PVC Plumbing
    Four Shallow End Steps
    6 Ft. Bench Off Shallow End Steps
    6 Ft. Love Seat/Swimout
    8 Ft. bench in front of spa
    2 Deluxe Skimmers/2 Returns
    LED Lighting System/Changes Colors
    Transferable Lifetime Structural Warranty
    Safety Double-Bottom Drains
    Solar Recirculating System
    Stub Plumbing For Automatic Cleaner
    Backwash Hose
    6" Band of Water Line Tile
    3" Tile Trim On Steps/Benches/Swimouts
    Marblite Plaster Finish
    Natures 2 Clear Vision Purification System
    Free Water Analysis/Chlorine & PH Test Kit
    Initial Start-Up/Instructions/Indoctrination
    Rope, Cups and Floats

    I think that covers it.. we settled at $55. Yes it was sticker shock for us as well, but it will be well worth it next year when the sun is shining. :)
    I had 3 companies come out Swim-Mor, Sylvan and Ashley. Swim-Mor was the most reasonable, but we felt their fit and finish was not the greatest. Ashley, we didn't have a good feeling about for some reason, and Sylvan we decided just had the experience and the salesguy has been great. We did the pay half now, pay the rest next year program, so no matter how far they get this year, we don't have to make final payment until next year in May.

    Good luck on your decision... it's a $$ one !

  • 19 years ago

    Moocat - can you expand on your comment about Swim-Mor's fit and finish? We are seriously considering them...

  • 19 years ago

    Hi Hawkfive,

    Sure I'll expand and I mean no harm to them, the saleguy was really nice, and I am sure they would build a nice pool for you. We are just very particular about certain things.
    When I say fit & finish I am referring to things like tile not being even, coping and grouting to be sloppy and the way their raised beam ends in comparison to other PB's. My husband had even pointed things out in their own sales brochure photos, which should be the best of your best. I knew that if we chose them I'd be picking at everything and I'd rather spend the extra $ and be happy. I know that they use all in house workers which means all the work I've seen is kinda what everyone gets. I also felt there was not much variety, which I thought was due to the same people doing the same stuff over and over.
    I am picky.... and I know I am not in the majority. :)

    I think that everyone has their own reason for going with one company or another whether it be budget, comfort or referral. It's a personal decision for us all.

    Good luck in you build. :)

  • 19 years ago

    Hello Mrs.Mack. We just had a pool built in less than 30days in GA. Awesome pool builder. First let me say that 38k is not shocking it's actually a good price. One thing I would like your PB to state in the contract that if he has miscalculated on his estimate that he would absorb the additional costs. Second, the payment plan. I don't like it. Way to much at excavation and way to much after concrete shell. 45 the 55. I personally would not do business with a company who wants that kind of payment plan. Our PB had a very reasonable payment plan. 10% down payment to get things started after signing the contract. 14% after excavation, 14% after concrete shell. All other phases 10% upon completion. So pretty much 10 payments total to complete the pool. Another thing I would ask for is 2 skimmers and 4 return lines or what he calls inlets. If you want your pool to have good water circulation. Below is our specs to compare with yours. I also provided a link of our completed pool project with pics of all phases start to finish. Our pool bid was less than 50k and we have an fantastic pool. Worth every penny. Fencing and landscaping was additional. Hope this helps. Everyone who sees our backyard loves it.

    Our pools specs follows:
    18x36 freeform shape
    Escavation and final grade for landscape
    Depth: 3.5'-5'-4' (Sports Pool)
    Custom entry steps with 6' of wing benches with Umbrella sleeve on first entry step.
    Engineered steel pattern with #3 and #4 rebar rods
    All plumbing 40PVC with 2 skimmers and 4 return lines
    Shotcrete Shell with 12" Flagstone Coping around pool
    4' Sheer Descent waterfall with separate 1.5hp pump
    AquaLogic PS/4 with AquaPod Remote, 1 1/2 HP Hayward Pump
    Hayward Cartridge Filter
    Hayward Natural Gas Heater 400K BTU w/Electronic Ignition
    Electical Bonding of Pool and Equipment
    800sq Ft of Sundek finish concrete decking with steel rods and 2 umbrella PVC sleeves
    1-500watt pool light
    Four inch drain line: 100ft
    52ft of 2ft raised bond beam faced in Stacked Flagstone
    36ft of stone finger ledge in raised bond beam wall
    6" ceramic tile around entire pool at waterline
    StoneScapes Carribean Blue Pebble Plaster
    Double Main Drains in deep end of pool
    GoldLine Salt Purification system SWG
    Polaris 280 Automatic Pool Cleaner with separate pump.
    Start-up service and instructions
    Maintenance Kit: Telescopic Pole, Brush, Net, PH test kit

    Here is a link that might be useful: SALSAJOSES POOL COMPLETED LINK

  • 19 years ago

    Moocat,

    Can you contact me at hawkfive@comcast.net to discuss further?

    Many thanks.

  • 19 years ago

    After looking at my quote I forgot two things..

    Two colorlogic 500 watt lights in pool
    Solid safety cover with pump

    I know the cover which is a custom shape was around $4000. and the extra light close to $900 I think.

  • 19 years ago

    My schedule was awesome. I didn't pay a dime until the gunite was shot, tile and coping installed, equipment, and decking poured. Then I pay 90%. The last 10% comes after startup.

  • 19 years ago

    40% due at excavation
    55% due at concrete application of shell
    5% minus $250 due at application of interior finish
    $250 due upon securing CO
    So, 15K in the pocket for about 5k worth of work...I'm guessing the extra 10k you are forking out is paying for plaster on the Jones's pool across town. That's front loading and it's illegal.

    The $250 should have another zero if you want to get anything wrapped up in time.

    You have about 5K in equipment so to keep his payment schedule, assuming he won't budge, insist that ALL equipment and plumbing materials be ONSITE when you cut that check along with a lien release. That would at least be close to what the out of pocket would be.

  • 19 years ago

    We've had problems trying to get our builder to finish up the details. They started building a pool for us in the spring, and we are still trying to get them to finish up the final details. I recommend withholding about 5-10% of the total cost until after final inspection and you are completely satisfied. We gave them the final check almost 4 months ago, when is was close to being done, and the quality and effort they put forth pretty much disappeared immediately. I've tried to talk to the owner to resolve it, but no luck. Our payment schedule was:
    40% at excavation
    35% at gunite
    15% at tile and coping
    5% at decking
    5% at plaster

  • 19 years ago

    I am a gunite builder in the midwest and the price sounds pretty low for what you are getting, but I agree with "repair guy", 2 inlets are not enough for a 2 hp pump. Don't get hung up on pump hp, look at the flow rate and hydraulics. I would also like to see 2 skimmers on this because if the main drain valve is closed, one skimmer won't supply a 2 hp pump and it will keep the surface cleaner with no dead areas. Also, the payment schedule is bad. We get 10% down and 10% on final inspection, with the remaining 80% based on progress benchmarks depending on the project.