temporary support wall

13 years ago

I would like to remove this wall by the stair landing and put a beam under it. How would I build a temporary support wall if the joists run parallel to this wall? Would I support it as close to the edge as possible?

Thanks in advance.

Comments (9)

  • 13 years ago

    You'll need to provide a lot more detail to receive an opinion other than "call an engineer".

  • 13 years ago

    Maybe I wasn't clear on the question. An engineer has approved a plan to remove the wall and place a beam there. My question was how would you build temporary support when the the floor joist runs parallel to this wall? Do you just support the joist next to it until you get the new beam and columns in place? Hope that makes sense.

    Thanks.

  • 13 years ago

    "An engineer has approved a plan to remove the wall and place a beam there."

    Where is the plan?

    There appears to be a perpendicular intersecting wall?
    Is there a foundation under these walls?
    Is this a raised foundation?
    Are the ceiling joists running parallel to the wall to be removed?
    Is there a double joist above the wall to be removed?
    What is the size of the ceiling joists?

  • 13 years ago

    If an actual structural engineer were consulted, then the plan he provided includes the information that you are seeking. There's more to the report than, "Yes, the wall can come down."

    So, go back to the engineer and have him complete the report that you paid for.

    And if you only got a WAG from someone who works for the roads department at a backyard bar-b-que, then it's time to make some calls and get an actual structural engineer to pay the actual site a visit. You've got a complex situation that is out of the realm of most DIYers. As it should be. Mucking about with removing walls next to stairs in a multi story dwelling should be approached by a crew with both muscles and brains, and should always follow the engineer's directions for removing said wall.

  • 13 years ago

    Is the new beam going to be supported by a post at the corner of the stairs (where the end of the wall is now)? Is it going to be flush with the existing floor joists (i.e., in the ceiling) or below them?

    If you describe the "after" we might be able to guide you from the before to the after.

    Also, what's on the other side of the stairway, where we can see a door? Is that just a narrow hallway or is it a room?

  • 13 years ago

    You will need to support whatever the current wall is supporting and that is unclear from the photograph.

  • 13 years ago

    Thanks everyone so far for responding. To generally answer all the questions, the structural engineer plan has specifics on placement of column and beams, type of beam/columns, size, mounting instruction, etc. What it doesn't have is instruction on how to TEMPORARILY support the floor in order to remove wall & replace with new beams and columns. I just assumed that knowledge is with the framer/GC.

    Regardless, the reason I'm asking is not to DIY, but to have some understanding so I can ask the right questions with my GC/framer. Never hurts to have some idea right?

    So I'll ask again, this time with more specific picture. The red lines in the pic are the second floor joist. The yellow lines are where the steel beam & columns are going (I know, the beam goes pass edge of the wall...it's by design).

    So, if you were to remove the wall (now exposed) between the two columns, how would you temporarily support the joist above that wall. If the joists were running perpendicular to this wall, I wouldn't be asking. Hopefully, this all makes sense.

  • 13 years ago

    More sheetrock needs to be removed to expose the header for those ceiling joists.

    Once you can see how the joists are carried by the header, you'll know where to place the jack post for temporary support. I think a single post is all that's necessary, positioned under the header as close to the corner as possible.

  • 13 years ago

    Are those finger jointed studs?

    Never seen such a thing.

    Without seeing what's above the floor and what it's holding up you can't get an answer.

    If it's just the section of floor then I'd agree with aidan m.

    I'd use a plate of some kind under the post to spread the load.

    But without seeing the load I'll say "Trust your builder".