Let me first say that we are working with an architect already, so I'm posting this question to satisfy my own curiosity while we wait (and wait, and wait) on the architect.

We plan to bump that back of our house by about 6'. Since this is a bearing wall we know that a support beam will be required. My question is this...

The second floor of our house cantilevers out approx 18"-24". When framing the addition could the new support beam be built to support the end of the cantilever as opposed to being in the location of the current outer wall of the first floor?

It would seem to me that this would make framing and eventual demolition of the existing exterior wall a bit simpler.I would also think that it would make integration of the two structures a bit more 'seamless.'

Thanks.

Comments (6)

  • 20 years ago

    Had to prolong your wait, but I would have to say possibly, but not necessarily. By doing what you suggest, the span of the existing second floor joists would be increased by the 18-24 inches cantelever. Depending on the size of those joists, this increase may result in too large of a span. Even if it is strong enough, the second floor will probably also be "bouncier" if that is an issue.

    There may be other factors as well, but this is the first thing that came to my (amateur) mind.

  • 20 years ago

    I've said this a number of times on the forums, but the very best planner for cost effective/creative framing and structural issues is a framing contractor. They do it all day long.

    Architects, IMHO, do not always do this well. They may get it right, but not always easiest or best or most cost effective.

    Per your question: a temporary wall will be build anyway to do the demo or the existing wall remain until the new one built. Without a photo, it is hard to say, but the second floor will be secured by a beam, but it may be a relatively simple one like a laminated beam that is the same depth as the ceiling joists. Or make up one on site with 2x? with plywood. Etc..there are usually a few different ways to do something in a sound manner. Comes down to cost and look.

  • 20 years ago

    In general, if there is not a span issue on upper floor, yes. Based on the info you have given, I dont think one way will look better than the other.

  • 20 years ago

    Julieann, you sound like you know a lot, and I agree with you that an experienced framer knows how to get around things, but would temper that with the advice that you make sure a)framer knows the code and b) framer will follow code.

    An interesting idea, making a beam on site with ply etc - sounds like you are proposing a manufactured beam, and I wonder if there'd be testing or certification requirements for such a thing.

    The third possibility, especially if one's wanting to keep to the ceiling joist depth, would be a steel beam.

  • 20 years ago

    There are a many ways to do a beam: (1) 2x12 (or smaller) on either side of plywood, glued and screwed. (2) Flitch plates, sandwiched the same way but where you replace the plywood with a plate of steel and thru-bolt it. (3) laminated beams (prefab) (4) other steel. These are pretty normal for building trades and framing contractors or welders make them up all day long.

    In all cases, these beams must be sized to hold the load, specified as to fit, end load considered, etc. Even though beams made up by the contractor are very common, the beam for YOUR particular situation (and all others) will be very specific. For instance, these specifications are bolt size and pattern, thickness of steel, specific Simpson ties required to attach joists...that sort of thing.

    In my opinion (and most building depts), an engineer is the ONLY person who should approve the structural designs with the list of all those little details and that approval is in writing, either a letter with a stamp or the architects plans with an engineer's stamp on the structural.

    So, what I suggest about the framing contractor is to come up with a suggested design (for cost savings and creativity) that the engineer signs off on.

  • 20 years ago

    Thanks for all the help - this was definitely educational. Here's to hoping the architect finally gets on to it for us.