Software
Houzz Logo Print
ktj459

Kitchen progress- we've made it look like more work!

12 years ago

We've gone from this......

To this!:

The cabinets were even more damaged than we thought, and there were three leaks instead of the one that we knew about already. It ended up being a really good thing to open everything up. Someone at one point cut into a load bearing wall to recess the fridge without doing anything but cutting into the wall. There was tile behind the wainscoting, two layers of linoleum under the cabinets (one must have been from the inception of linoleum it was so old) and no electric on the stove wall. The stove and the fridge were plugged in the basement by routing their cords through the floor! Electrical was even run through the upper cabinets with extension cords! Anyway, we are glad it's all down now and we can do everything properly. Time to start putting it all back together!

Comments (5)