So, as some of you may recall, we own a VERY old house. And, the kitchen is an addition done about 100 years ago. You may also recall that our renovation is a FULL gut reno - new electric, new plumbing, new structural carpentry, etc.

Well, things were going fairly smoothly (structural carpentry done, plumbing and heating in, electric in, chimney redone, etc...), until the inspector came and failed our carpentry! Basically, he said the ceiling in our kitchen (which has a 2nd story office above it) is not meeting code and needs to be redone. Remind you, this is the same ceiling that we just paid our carpenter to fix!

So, redoing the ceiling requires some of the new electric to be pulled out (and later put back in) and about $900 of new materials to be bought. Then there's the labor.

Well, our carpenter doesn't think he should have to swallow the labor costs, even though we hired him to do the job and his first run didn't pass inspection. He thinks we should pay for it, along with the redo of the electric and materials.

I can understand the electric (sadly, inspectors in our town wait until after the mechanicals are in to inspect), but the material and labor have already been paid once. Why should we have to pay for it AGAIN!?!? If it was done right the first time around, we'd be insulated and sheetrocked and have anywhere from $1500 to $2500 not wasted on fixing mistakes.

But, all we asked for was the carpenter (who's licensed and insured) to swallow the labor costs. Isn't that fair!?!?

Comments (10)

  • 17 years ago

    Can you be more specific about how the ceiling doesn't meet code?

  • 17 years ago

    The joists in the ceiling are 2x6's that are double and even triple sistered (that's what the carpenter did - the sistering). But, since they span 14 feet, we're told that's too far of a span considering there's a room above.

    We need to either put in a joist perpendicular to cut down the span, or beef up the joists using microlams or 2x8's.

    According to everyone we talk to, our carpenter should have known that 2x6's wouldn't pass inspection, or should have checked before assuming...

  • 17 years ago

    Did you have an architect that submitted plans to the city and then provided plans to the carpenter? Did you have a contract with the carpenter and if so, did it spell out specifics?

    Of course this should be on his dime. Of course he should have known the specs. I'm afraid it's one of those things where he oughta cause it's the right thing to do, he's contractually obligated to do so, or ya' knew what I was going to do, I did it, and pay me again.

    If you had an architect or a contract with the carpenter; all your costs seem as if they should be covered.

  • 17 years ago

    The structural engineer or architect for the project should have specified the details as to what needed to happen to beef up the support. A carpenter is not legally qualified to determine live load capabilties of supports in structures. He is there to construct the support according to plan, not make the plan. If you relied on him to guide you in what would be acceptable, then you both are at fault and you both should equally share in the costs to redo it to code specs.

    And you should always have a structural engineer's inspection and plan when dealing with elements of this nature in an older home. Even General Contractors should require a structural inspection from an expert and not rely on code inspectors to make sure the structure is sound. Not every code inspector is as diligent as yours! Be very thankful that this gentleman failed you!

  • 17 years ago

    I respectfully disagree with live wire oak.

    All work that your carpenter performed carried with it an implied warranty of workmanship, including that the work would be performed pursuant to code. I think if a carpenter performs work that fails code, then the carpenter should pay. HE IS THE EXPERT AT READING THE CODE. It is ridiculous that you should bear the responsibility for his professional shortcomings.

    Perhaps on a larger residential or commercial construction project, I agree that building according to a PLAN would not be a subcontractor's fault, in fact, subs are generlly contractually required to supply all labor and materials to substantially construct according to plans... but it doesnt sound like its this kind of project.

    You know what? Be happy your inspector failed you. Insist that the work be re-done for free. If he refuses, fire him and hire someone else.

  • 17 years ago

    Hmmm... Well we had a similar situation. Old house with 2x6 attic joists. When we were considering adding a second story, we went into the structural restrictions and how to beef up the joists to meet code. We ultimately did not do this (too expensive!) but what I wanted to say is that all the carpenters and builders we had bid on the project told us that it would be our responsibility to get those joists spec'd and stamped by a structural engineer or architect. In other words they did not want to have the responsibility of deciding how to build it.

    I know that there are different customs for building, contractor relationships, etc in different parts of the country. I am in New England.

    My sense is that IF your carpenter gladly took on the full responsibility to design and spec the work himself, he should have to cover it. But if there's any ambiguity there, or if you told him to 2x or 3x sister the joists, then it's your responsibility.

    Maybe you could ask your building inspector what is the norm for your part of the country?

    I am sorry you are having to go through this. What a drag to feel "almost done" on that part of the project and have to be set back however many weeks..... I feel for you!

  • 17 years ago

    Without spec's and a WRITTEN contract, things can get a bit murky. First question, who took out the building permit? If you as the homeowner, aka general contractor, signed out the permit, then it is your responsibility to insure the work is performed to code.

    You mention he is licensed. What kind of a license? In most states, carpenters are not licensed like electricians, etc. They certainly are not engineers, and are not required to know the code. However, if he is licensed as a general contractor, then I would think that implies a knowledge of the code. Check with your state's licensing bureau.

    When you say he is insured, what do you mean? Is he bonded, have errors and omissions insurance, or does he just have workmen's comp?

    PS For those who hire outside contractors, if they do not have workmen's comp, and they get injured on your property or while doing work for you, guess who is financially responsible? In some cases they can be driving to the lumber yard to pick up supplies for your job, have an accident, and you can be sued. Always ask for certificates of insurance, and then call up his agent to make certain that the premium has been paid! Check with your own agent to be sure you're properly covered.

  • 17 years ago

    Words are important.

    You call him your "carpenter".

    Was his role always to just be the guy to come in every day and work a plan, not ask questions, or did he have a more general, more contractor-ish role in the shaping of that plan, in which he might have had more of a duty to say, "Hey, I have concerns. Did the person who made this plan call in an engineer?" If he was effectively a sub, and treated as such, I can't really blame him for just working the plan he was given.

    Or was he the one who said "I'm going to do this this way. Yeah, it's fine with code. We don't need to call an engineer, it's the same thing that was there before." If this is the case, I'd remind him of this.

    It might also help to talk to someone in the code office, find some talkative employee who might be willing to tell you if they have heard how situations like this were resolved in the past. I guarantee they have heard it all!

    In my humble opinion, you are better off sitting the guy down with coffee or a beer and saying this is a mess for both of us and not assigning blame and saying you're going to be out of money either way, and not taking any crap but trying to appeal to his better nature. Coming out and trying to force and shame and nag an adult male won't get you anywhere except a big fight and taking him to court isn't a sensible remedy. So try and work it out, even if you just get part of what you think you're owed.

    If you're persuasive, you'll get what you need.

  • 17 years ago

    Final answer:
    2x6's are not strong enough and any good carpenter knows this. Every manufacturer of floor joists makes a guide that is readily available and free for the asking. These guides have all available data on joist, trusts, hangers and specifications including weight and strength. The guides are available on the net or at the lumber yard. They are easy to read.
    Your carpenter is at fault. Hope you haven't paid him yet.

  • 17 years ago

    You can obviously spec enough 2x6's to safely span 14 feet, but the deflection will still be an annoyance. A triple 2x6 (structural fir or clear yellow pine) on 16" centers will bear the needed weight, but will still feel something like a trampoline.
    You should have used clear yellow pine 2x8 12" OC to get a floor within spec for _deflection_.
    What kind of permitting process was involved? In my locality for structural modifications you need a set of drawings with an engineer or architect's stamp (of approval). If what you actualized matches what is on the drawings, the inspector must approve it.
    But it never pays to antagonize the inspector.