kksmama

Contract time, nervous! WWYD

13 years ago

I like the GC with whom I've been working on my design. He will demo, make and install cabinets, fabricate the granite, run the electrical, run the hood ducting through the roof and create a "turn key" kitchen with employees (except for plumbing, which he subs out, and painting which we will do ourselves to save money). He will install things that I purchase (servo drive or utrusta for garbage pullouts, water filter, garbage disposal, faucets, soap dispensers, sinks, cabinet hardware).
The proposal breaks down demo (2200), electrical (2160), plumbing (1200), slab trenching, floor repair, carpentry and drywall (3000), cabinet hood fabrication and install (2050 not including liner - ouch), granite (5060 for 92 sq feet level 2), and cabinets (16700). Cabinets are full custom white shaker, soft close, with crown and some glass doors.
He has a good references from customers and other people in the industry, and I trust that he will do quality work.
I'm concerned that as the job progresses I'll think of things that should be added or tweaked, and wonder how the cost of those will be calculated. I think that before I sign/pay the design will be done - but really, doesn't everyone run into unexpected issues? How should our contract be worded so we both know how those will be handled? I do not have an unlimited budget, but my enthusiasm for beautiful, functional, GW ideas is boundless! What is reasonable if I decide I have to have an eye-vac and the toe kick has to be adjusted? Part of me doesn't want to sign a contract until I see Amanda's reveal! I know I could spend many more weeks going over every detail of the design...but I think it is time to move forward.
Advice, please?