I'm trying to remain calm while writing this:) We just remodeled our Kitchen and hired a GC. He put the tile in and it it uneven. Right now I'm trying to collect information on how to correctly handle this situation. We have stated to him that the tile is uneven and his fix was to add more grout (Steam coming out of my head). The floor is still uneven and the Grout lines are now horrendous as they do not match up and he basically grouted over a portion of the lower tile.

Any recommendations on what I should say to contractor? Or do I just fire him and get someone else in to do it and take him to court?

He has a few other bad things also..like floor trim...but right now...I'm more concerned about the floor. (PS...I did not sweep before pics...Warning Dog hair)

Pictures Links (More Pictures)

Kitchen Floor
http://flic.kr/s/aHsjM5zrUZ

After Supposed Floor Fix (Added more Grout)
http://flic.kr/s/aHsjM5BmxU

Comments (32)

  • 13 years ago

    Another picture teaser - More Pictures in the 2 links.

    Here is a link that might be useful: Uneven Kitchen Floor (Link 1)

  • 13 years ago

    Here is Link 2 after his supposed Grout Fix. I used a level this time to show how uneven the floor is.

    Here is a link that might be useful: After Supposed Fix

  • 13 years ago

    That is bad. Was the GC the tile installer? I personally would be very worried about him doing anything else if he is trying to pass this job off as acceptable. Where are you in the renovation process?
    Very pretty tile choice.

  • 13 years ago

    Yikes, that looks sloppy. After he added more grout, did you express your dissatisfaction? What was his response? Is the GC actually doing the work or is he subbing it out?

  • 13 years ago

    That is unacceptable. That floor needs to be ripped out and redone by a competent tile installer.

  • 13 years ago

    That looks dangerous and it's a tripping hazard. I would not pay him and would find someone else who knows what they are doing.

  • 13 years ago

    He did the grouting yesterday. We are talking to him tonight. I will update everybody how that goes later tonight or early in the AM. He did the kitchen floor while he brought in a guy to do the other parts of the house. The others parts look great.

  • 13 years ago

    OMG - that is so bad. I could do better. That he thought this would fly would make me worry about the rest of the work he's done. And to put more grout on top of already done grout? /facepalm

    From your first picture, it looks like the tiles are at different depths. Did he not level your floor first? Was some tile back buttered and some not? It has to be redone.

    I'm so sorry you have to go through this hassle.

  • 13 years ago

    Is the whole floor like that or just one area?

  • 13 years ago

    I wouldn't believe in a minute this guy didn't know what a bad job was done. He knows and it is an insult to your intelligence for him to think you would come close to agreeing with what was done. Adding the "fix" is adding to the insult. There is no way this job will hold up.

    Hopefully you haven't paid a cent to him on this install. And I wouldn't consider using him to redo any portion of the floor. How this works legally is beyond my knowledge. But would get someone in that is certified to detail on paper what has been done. Along with your photos. I always worry about liens and would want to be one up on him .Plus you are vulnerable to falls from tripping, as are others visiting your home.

  • 13 years ago

    Wow, not acceptable at all. It won't be long before someone walking barefoot will slice their foot on one of the pointy sharp corner or edges that are sticking up.

  • 13 years ago

    Update -

    Yes...the whole kitchen is like this.

    He said after he got 2/3rds done he realized the floor was uneven yet he failed to tell us or stop. He also thinks the floor does not need to be fixed, by him, as he followed what the distributor/sales guy told him.

    At this point I am steaming and told him to be fair to both parties and to make sure I'm not overreacting that I would bring in a couple contractors and a consultant to get their opinion. I am waiting to hear back from him now.

    I stopped him from trying to grade our floor and filing it. I told him that would make the manufacturers warranty void and could cause the tile to chip and crack down the road.

    I will wait back to hear his solution today. The only solution I will accept is to remove the whole floor and do it right.

  • 13 years ago

    Yes, the only solution is to rip it out, prepare the sub floor correctly, and have a competent professional do the install. Sorry you have to deal with this. Good luck.

  • 13 years ago

    Unfortunately, it looks like the kitchen was completed after the tile was installed.

    Will a tear out mean taking out the rest of the kitchen first or can it be done without taking out the cabinets and appliances?

  • 13 years ago

    I'm assuming they can take the trim off and cut around the cabinets to install the floor. That is another hot topic. It was installed back to back. This is why I believe that he laid the floor himself instead of a tile guy because he was in a hurry instead of planning it out or delay the cabinet people. If I would have known...I would have told the Cabinet people to delay a week.

  • 13 years ago

    Any house (new or old) will have areas where the walls and floors are not even. If it's an older house where years of settling (plus earthquakes if you live in certain places) take it's toll, the unevenness will be worse. ANY decent tradesperson will know this and check out the floor before tiling. Getting a floor level can be fairly simple although a little time-consuming. The fact that he never thought about it and mentioned he was just following the mfr instructions, make him sound like a hack. Just a two-bit handyman. And his suggestions for how to fix things, prove he doesn't know what the hell he's doing.

    Personally, I wouldn't let this guy touch anything on my house. Hopefully you haven't paid him all of the money yet. I would bet that when you have a real tradesperson come in to take up the floor, the tiles will come up very easily (except where he double grouted).

  • 13 years ago

    FYI, large format tile is very very tricky to get right. The subfloor has to be very flat, and you can't do a running bond pattern with them because they have raised edges that show up worse with that pattern. Some lippage is unavoidable with anything but a stacked bond pattern. That's why manufacturers usually recommend only a 1/3 overlap pattern. Some manufacturers are also recommending against the use of thinset with very large format tiles. Medium bedding mortar must be used in order to get minimize the lippage.

    And that's why you use a tile specialist to do tile. And pay extra for the extra floor prep needed.

  • 13 years ago

    I am very sorry this happened to you.

    unless you had a long discussion with the contractor and tile layer prior to this being done where they explained a sub-par result due to existing conditions, this is unacceptable. It was their job to tell you if the floor needed leveling prior to laying tile.

  • 13 years ago

    No existing leveling conditions. We had a perfectly tiled floor before this. They ripped out that floor and then put in sheets of wood and screwed them into the floor...then tiled.

  • 13 years ago

    I hope you're not saying he tiled directly onto the wood.

    If the tile is running under the cabinets, he is in deep to have this fixed.

  • 13 years ago

    Oh LORD I can't believe what some people do and expect to get paid. Ixnay on the out-gray. Jeepers.

    And yeah, if he tiled on plywood and not cement board he might as well start the tear out.

    I hate this stuff happening. Such a pain.

    We just today discovered that the guy that made our window trim didn't plane the boards to the same thickness resulting in gaps around the windows that now have to be caulked. Really?

    Oy vey.

  • 13 years ago

    "I hope you're not saying he tiled directly onto the wood."

    Ditto that! Hopefully he used Hardibacker underneath and not wood. Regardless, the tile install is a hack job.

  • 13 years ago

    Here is a picture of what he did beneath tile.

  • 13 years ago

    I guess we're looking at backer board over the wood? All those air gaps look bad, does not ensure a stable and solid subfloor. Has to come out anyway, just saying overall it looks like he was drinking when he did this floor. I wouldn't let him work on the house anymore.

  • 13 years ago

    I just showed the pic to the guy doing my cork floor today and he said "I don't know what that is?"

    Is that cement board on top of...? What is the gap-ed area?

    Thinking it's a do-over hands down.

  • 13 years ago

    It almost looks like a rug pad, lol. Doesn't really look like cement board I've seen.

  • 13 years ago

    I think that is a picture of plywood and that gray thing on top is the tile.

  • 13 years ago

    It's a complete re-do. He had NO idea of what he was doing. Sorry.

  • 13 years ago

    By the way, you should have the rest of his work inspected, where anything hazardous could be involved like electricity, plumbing, structural work. If he's done any other tile work, like a shower area, beware of potential water damage. Whatever work he was overseeing as GC I would be very concerned about. He doesn't appear to even have any building experience, or common sense, having done something so foolish as that.

    Know that even though something might appear to be alright on the surface, that may not be the case.

    Good luck.

  • 13 years ago

    With all the air gaps, maybe the tile should have been set in mud vs mastic or whatever they used? It looks like it will all crack in a short amount of time

  • 13 years ago

    I'm glad this thread was bumped and hope the OP comes back to tell us how the problem was resolved.

  • 13 years ago

    Currently the problem is not resolved. He has basically abandoned us for 2 weeks with no return contact an unfinished work not including the floor.