Software
Houzz Logo Print
natsis_gw

how and when to move heavy range

17 years ago

My new wood floors are in and finished, my cabinets are in and my granite will be installed next week. I still need the electrician to do his final work, the plumber to run the gas line and ref. water line and hook up faucet/disposer. I also have installers for the dishwasher and hood. I'd like to move the refrigerator and range as few times as possible. The range specs say shipping wt. 260 lbs. Both are sitting in my tile entry right now (still in packaging). I'm trying to figure out who will move the range, when and how. Do we test fit after granite and move again for the gas install and hookup? What's the best way to move these heavy things without damaging the floors?

We are acting as our own contractors so don't have experience doing this. I would appreciate input from anyone who has done this before.

Comments (9)

  • 17 years ago

    HD and I'm sure other stores sell these big plastic "feet" with thick felt bottoms that are designed for moving appliances (and other heavy things) on wood floors. We've used them to move our dishwasher and range several times. Once you get the feet on moving is really easy.

  • 17 years ago

    How would you remove them from the back feet after pushing it into place?

  • 17 years ago

    We remove them at the last possible moment before they become inaccessible. We followed the advice we found online and did not install hardwood where the stove and dishwasher live (or rather will live). Those areas just have plywood installed to the same height as the hardwood.

  • 17 years ago

    Proper weight distribution is critical when moving anything heavy on wood floors -

    For instance - I had an upright piano that had little wheels on it - when moved, there was indentation on wood floors! RRR

    Someone moved our new refrig out (hmmm wonder who) to access the plumbing line for ice - NO, NO - that has little wheels too
    A proper appliance dolly w/big wheels (properly distributes the weight) or I put a piece of plywood in front of fridge when they had to pull it out -

    The appliance store should move them - & I would suggest having the plumbing for refrig & gas for stove done before moving them & before granite install (?fabricator did template w/o the appliances in place)- they should only have to be moved 1x -

  • 17 years ago

    Gas and water should have been done while the walls were still open before drywall and paint. I'd get that done pronto. The appliances go in and are hooked up right after the cabinets are done and before the counters are templated. If there is a cooktop, that's available for template time and ready to drop in place right after they lay your counters down. Once the counters go in, it's touch up painting and other final adjustments to cabinet doors etc and the kitchen is done.

  • 17 years ago

    Rent an air sled

  • 17 years ago

    When I installed my 36 inch Monogram range (at least 400 pounds), I put felt squares on the feet. I slide my range out to clean all by myself a few times a year. It doesn't do any damage to my Cherry floors and allows me to get all the crumbs out from underneath too.

  • 17 years ago

    Thanks for all the tips, I also heard to put a masonite board down and slide it on the board instead of the floor. The air sled is cool but I'm not sure how many times I will need to move the range during granite install. and gas hook up so might be a pain to rent. If felt squares can support a 400 lb range than it should definitly work for my 260 lb one.

    Live wire, gas and water need to come up under my floor from the crawl space due to the way my house is framed. The granite fabricator/installers did not require the range in place for templating (just on site) and they do not want it in place during installation. Don't know if this is typical but it's what they request.

  • 17 years ago

    We took out the oven racks, removed the slide out bottom drawer, and removed the burner grates. After doing that, I was surprised how much lighter it was.