My husband and I are planning a kitchen remodel for next summer and I'm trying to plan now and build our budget. We've got our 'A' list and 'B' list of things we'd like to have and things we must have. Getting an actual idea of cost will also affect whether we do the remodel in spring or fall, etc. My question, can I start calling contractors for quotes now or will they not want to come over because the project is nine months to a year off? On the other hand, this is our first remodel of any great scale and I really need to establish some parameters before we jump in. Thoughts?

Comments (10)

  • 16 years ago

    I'd hold off and do a bit more research. The best guys are busy and you don't want to burn one out. Ask here instead.

    Much to learn. One trick would be to go to a big box and talk with the kitchen cab folks, work up a kitchen and get a quote. You'll learn much about cabs and sizing, have rudimentary drawings and a much better plan going forward.

    Save up for lighting, it always bites you if you don't. Think early about floors, electrical, plumbing and all the rest. Where should everything go. Draw up some plans over cocktails. Get informed.

    Then call the guys in for workups.

  • 16 years ago

    That is some Good Advice!

    The more self education you can do, the better informed you will be.

    Knowing what you want and what is feasible will save you time and money when you are getting into the crux of the job.

    Your timing is perfect.

    It might not be a bad idea in this economy to "reach out" to a few contractors and let them know you are interested in a project next year, and ask them when they would want to be contacted by you to do an initial visit.

    This will not only give you an initial impression of them, it will let them have your info and if they do have a low point in their schedule, they may reach out to you and ask you if you are ready to move forward. And it lets them know you respect them and don't want to waste their time.

  • 16 years ago

    I like Julie's suggestion above. We had a hard time getting fit into our contractor's schedule and we got an estimate from him six months in advance of when we WANTED to start (May or June). We just started Sept. 1.

    Good contractors still have plenty of work and you don't want to be forced to choose a contractor based on their availability.

  • 16 years ago

    I've already addressed the basics of style and layout on my own. I've got a couple different cabinet options and know the aesthetics of what I want. I guess my main issue is actually building the budget. My husband and I like to be as informed as possible and also believe that you save up the money for stuff like this and have it in your hand before the process begins. I guess I don't want to be making compromises on the fly. For example, if I know I can't afford the quartz countertops up front I'll be able to tweak the design so I'm not last minute loosing the star of my show...so to speak.

  • 16 years ago

    I do think that the forum is the perfect place to address these items. Below are the "invisible" costs of a remodel.

    Are you remodeling the existing space, or adding on?
    Do you need to upgrade electrical capacity?
    Will you be moving plumbing?
    Moving load bearing walls?
    Changing existing floor plan substantially, or replacing with similar sized items?
    Is this a "to the studs" remodel?
    Will an engineer or architect be required?

    Depending on the answers to the questions above, that will determine the beginning point of the budget. Because after all, if you don't have plumbing or electrical ready, it doesn't really matter yet what sink or dishwasher you select.

  • 16 years ago

    Are you remodeling the existing space, or adding on? -- Existing space.
    Do you need to upgrade electrical capacity? -- Electric will include new locations for fixtures and a couple new outlets including one wall that currently has no electric.
    Will you be moving plumbing? -- Sink and dishwasher are staying in current location.
    Moving load bearing walls? -- Moving a doorway. First choice; replace with pocket door. Less expensive option; open arch/door. Standard door not an option.
    Changing existing floor plan substantially, or replacing with similar sized items? -- Similar plan. Adding bit more counter space and cabinets.
    Is this a "to the studs" remodel? -- Ripping out a decorative drop soffit. Not all needs to be ripped out to the studs.
    Will an engineer or architect be required? -- No.

  • 16 years ago

    I wouldn't wait just because the project might be a year off. To get the best estimates you should make as many decisions as possible before calling contractors in. When you do talk, a contractor can look at your lists and give you fairly accurate estimates, even on things he'll sub out; for example, the different prices, installed, on various flooring materials. And during your discussions, the contractors may offer some interesting ideas/alternatives that you might adopt.

    I wrote some articles about remodeling: what the process is like, choosing a contractor, contracts, etc. which may help you. (It's my own website - no ads. I just do it for fun.)
    http://www.homeduover.com/Articles

  • 16 years ago

    Bill,

    I liked the kitchen remodel on your website. There are some similarities between how your space is situated and what we've got to work with.

    What do you think about the mini glass cabinets on top? I'm contemplating some smaller cabinets stacked on top like that, but I'm wondering how usable they are? I've also had some anti-glass opinions from friends and relatives (though they did the glass doors to a greater extent than you did).

  • 16 years ago

    zaphod42;

    The little cubbies with glass doors are fairly useless but they have lights in them that add atmosphere when the kitchen's not in use. (You have to use them as display, not storage.) They break up the wall of wood too.

    Bill

  • 16 years ago

    I just completed an extensive remodel. We started meeting with contractors in July 2009 with the intention of starting in April 2010. I would recommend starting now. I suppose it depending where you live, but the remodeling industry is hopping. We met with about 6 design/build companies and we got ideas from each one.

    Here is a link that might be useful: My Blog