Software
Houzz Logo Print
tsth5236

What exactly should a contractor do?

11 years ago

I've not felt real pleased with my contractor and wondering if my expectations were off? But, w/our bathroom remodels, have had issues where had I not been here to stop certain installations, we would have had messes. Contractor only stops in about once a week for about 15 minutes, and basically his job has consisted of making phone calls to schedule people/subs, to come out and do their jobs. This is the latest that happened:



This is the 2nd problem we've had w/this business..and when I contacted contractor about the broken backsplash...he didn't really show any regard to the fact that the installer was going to just install that? Being in business for ourselves, the fact that there was not much interest in the lack of quality, really bothers us. The contractor seemed happy that I handled it, and not bothered that the business was trying to install this inferior piece. I'm curious, how much involvement should a contractor have in a bathroom remodel? Should he be inspecting pretty often and checking daily with it? Should the contractor be handling the problem? My husband requested that the contractor be here for the granite people when they come back out to fix/reinstall the backsplash...as I am bothered that I am having to be the bad guy...and frankly don't trust the granite people w/regard to what they will bring back out to replace the broken backsplash. The contractor, just informed us he will be out of town that day. ugh. Just really frustrated.

Comments (16)

  • 11 years ago

    For my bathroom remodel my GC stopped by at least once a day, usually very early when the subs arrived and often at the end of the day. If he couldn't make it he would call me to make sure everyone was there as scheduled. I was home throughout the work, except for one day and he called me about a measurement question.

    The only problem was a squeak/deflect in the tile floor. It took two added efforts (retile, joist work), but it got handled without any grousing.

    I subbed the counter on my own and fortunately had zero problems with it or the fabricators/installers.

    tsth5236 thanked Bunny
  • 11 years ago

    Our GC for the master bath remodel we did last year was here almost every day, or would call to check in. He was very hands on, and did some of the work himself, especially helping the tile guy. I would have to say that we really lucked out with him in every way, but I would expect a GC to be on top of counter/backsplash installation, especially if there were a problem. I agree that he should reschedule the reinstall so he can be there. That's part of his job, not yours.

    tsth5236 thanked leela4
  • PRO
    11 years ago

    You should have never seen the broken splash. If it happened in the truck, I would have fibbed and said the guys forgot it and taken it back to the shop and repaired it. You would have never known.

    The fact that they did none of this is most telling.

    tsth5236 thanked Joseph Corlett, LLC
  • 11 years ago

    I know, and that he was trying to "install" it....floors me...which is why I wanted my contractor to be here when they come back tomorrow to install something else...I am not happy.

  • 11 years ago

    Joseph, in fairness to the marble place, that was "fixed"...that's how they sent it...after they had glued it apparently. I still found it blatantly unacceptable.

  • 11 years ago

    When we did our first bathroom, the contractor stopped by every day to check in. Thank goodness. So when that job finished and he was ready to start on the other bathroom, he knew to say to me "you don't want the same guy, I'll bet. I have someone else to send." He was absolutely right, and the guys who did the second bathroom were outstanding. So much so that later we had them in to do work that didn't require a contractor.

    I think the contractor should be aware of what's going on with his/her jobs.

    tsth5236 thanked bpath
  • 11 years ago

    Our contractor continuously checked on everything during my kitchen remodel. His subs were aware of how particular he wad and they made sure everything was the way the boss would want it. At one point when two of his guys had put in a long day, I told them I would clean up so they could get going home. They said thanks for the offer but the GC would be very unhappy with them if they didnt do the end of the day clean-up themselves. The GC always informed us ahead of time who would be there, what time they would be there and what they would be doing. His subs were never late.

    If your GC doesn't care much about what his guys are doing or the quality of thier work, the guys themselves probably won't care that much either. The GC should definitely handle any problems that arise and not even suggest that the homeowner handle it.


    tsth5236 thanked badgergal
  • 11 years ago

    My GC is on hand every day the site is open. He does a lot of the physical work himself, too. So far he's handled the very very few problems that have arisen. We're not to the stage where countertops are going in, but I expect him to be as professional as he's been so far.

    tsth5236 thanked artemis_ma
  • 11 years ago

    You guys are all very fortunate...I will say that our contractor did decide to come after all, today....(was really surprised, because I did not expect him)....the countertop looks very nice now! Yay for this.

  • 11 years ago

    Much better now....

  • 11 years ago

    Beautiful! I really love your marble. You got a great piece.

    So glad he showed. In previous renos, I had a contractor like yours who expected me to pass on messages to trades and at one point I remember him telling me to keep an eye on the tiler. Now that I'm more experienced, I realize I should have fired back at him, "no, that's your job." This time around we have a great contractor who may not be at the site everyday, but is keeping a close eye on everything and only has people he really trusts to do the best job. If I call him with even a minor issue, he shows up immediately and takes care of it.

    I hope the rest of your reno goes smoothly.

  • 11 years ago

    thank you daisy....today is another BIG day, as all the plumbing will be done....freestanding tub and faucet install, etc. Oh, and the countertop is a granite that looks like marble. I really like it a lot. It's called Super White granite, even though it's not white...lol.

  • 11 years ago

    tsth5236, super white is almost always actually marble despite stone yard selling it as quartzite or granite. Lots of information about this in the kitchen forum. I mention it only because you might want to read up on it a little and choose cleaners, etc accordingly. It's gorgeous!


    You must be excited to have the end in sight. Hope today goes smoothly!

    tsth5236 thanked Nothing Left to Say
  • 11 years ago

    It is beautiful. I found this article that gives some information on the geology of the differences.

    http://www.visionlearning.com/blog/2013/12/12/geology-kitchen-mystery-super-white/

    tsth5236 thanked ceezeecz
  • 11 years ago

    Thanks all! The plumbers are starting! So excited!

Sponsored
Custom Home Works
Average rating: 4.6 out of 5 stars10 Reviews
Franklin County's Award-Winning Design, Build and Remodeling Expert