Software
Houzz Logo Print
jpmom

X- Post — Design Fee

10 years ago

Need some guidance here.

We have been working on a plan to do some kitchen updates. We approached a company in the late fall to handle the cabinet painting. Since then, they have taken somewhat of an ownership role off the project - and while I don't really consider them "designers" — they are moving in that direction and have managed several renos this year. They have had some good ideas and have given us "guidance" through the process. I feel like we have come up with many of the concepts together. I did a lot of research myself, and forwarded them photos, etc.

They have moved beyond just painting - and are getting more into renovations. They have subs (fabricators, tiles guys, cabinet makers etc).

We've gone back and forth 5 or 6 times on the scope of the project. Started out small - then it morphed to something much bigger (replacing counters, modifying cabinetry). Now we've pulled back and are happy where we are. They came out and measured several times.

Never in the process did they mention a design fee. However, I did give them a $1500 non-refundable deposit that "would be applied to the project". She said it was more or less to protect them should we pull out, since they were spending a lot of time on it.

We made final decisions and are super excited with where the project is going. And as soon as my electrician moves/installs a couple of outlets - we are ready to go.

She just emailed me the revised plan, and has included a design fee. This is what she said:

"We have implemented an industry standard fee for design and project management on our kitchen remodeling projects. I have reduced this to $1,500.00 for yours as it wasn’t a standard charge when we initially quoted your project. As you’ve given us $1,500.00, this will cancel out the fee."

I have a problem with this. Do you agree?

Comments (25)

  • 10 years ago

    As the original agreement was that if you moved forward with their services, the $1,500 you paid as a deposit would be applied to the actual work done, I might have a problem with this as well. On one hand, they appear to be amending the original agreement by coming up with this suspiciously capricious fee. On the other hand, it does not sound entirely unreasonable to expect to pay a design fee, although as you have done a lot of the leg work yourself, I'm not sure what that should be. Will you be signing an actual contract? It sounds like everything thus far has only been verbal, and that's often when things become tricky. I'd definitely discuss this further with the person you're dealing with to see if you can come to an amicable resolution. It sounds like you're happy with the firm, and do want to move forward with them on the project.

    jpmom thanked User
  • 10 years ago
    last modified: 10 years ago

    Yes - we are very happy and I do like working with them. I certainly plan to have a conversation; just wanted opinions on whether or not this is out of line. I have no problem with a design fee - but do have a problem with it coming up now.

  • 10 years ago

    What's in your contract from when you submitted the $1500?

    jpmom thanked DYH
  • 10 years ago

    It is a new fee they are charging, but it wasn't a standard charge when they quoted your project. You are grandfathered in with their old fees and should not be charged this new fee. You have it in writing on the email she sent and have your quote without this fee. New customers or new project with old customers will have this fee added to their quote up front. You need to talk to the owner.


    I had a designer do this to me. When we started working her fee was $125/hour, a few weeks later, with the scope of the project increasing, she tells me she is raising her fee to $150/hour because she had to hire an assistant. I didn't know what to say and accepted it ... now I know to say that they have to honor the pricing they quoted for the current project.

    jpmom thanked chispa
  • 10 years ago
    last modified: 10 years ago

    DHY - no contract; It was in good faith. In hindsight, it was stupid on my part not to get something in writing. What I do have is an email from her requesting the deposit — here is part of it:

    "I met with Rob and Steve today to discuss your project. I want you to feel comfortable exploring all of your options, but as we’ve invested a lot of time already at this point, we all feel that we need to request a non-refundable deposit of $1,500 for our security. Should you move forward with the project, this would be deducted off of the project total.

    As I’m sure you can understand, a lot of effort goes into planning a project such as this. We just need a little commitment on your end to continue to invest more of our time. Please discuss with your husband, and if that all sounds good on your end, let’s set up a visit for Thursday or Friday of this week to measure for the alternate options."



    We did make changes along the way - but who doesn't make changes when doing a kitchen project? This process is a little new to her - so she was dealing with somewhat of a learning curve, in my opinion. I will speak to her - but feel that I should do so in person, not via email.

  • 10 years ago

    Since you didn't have a firm bid on the work (you've increased the scope of the work it sounds like) when you made the deposit and the $1500 is being applied to the final bid (which includes the design fee that they charge on projects), I think it is fair for them to expect you to pay them for some of the time they've spent on this project already, which the $1500 will be for.

    jpmom thanked olychick
  • 10 years ago

    "We did make changes along the way - but who doesn't make changes when doing a kitchen project? "

    This is called a change order. Change orders can be pricey.

    jpmom thanked maddielee
  • 10 years ago

    Maddie - I get it; but the design fee was not discussed up front. That's the part I have a problem with.


    Oly - I did have a firm bid. One prior to the deposit, and another after the deposit (when we made some changes). Now, with this final proposal, they have added the design fee. This was never discussed or included in the previous two bids. They just implemented this fee, as she stated in her email to me with the updated proposal.


  • 10 years ago
    last modified: 10 years ago

    My current addition contract does have a change order clause and I do believe I pay for any additional plans or blue prints needed to change the design. But I have it spelled out in my contract and was not charged for changes discussed before the architect's original plans were drawn and I gave no deposit for the firms time spent on a business proposal either. I only paid a fee for blue prints not pricing lists or estimate.

    I would discuss it with her and feel you need to have a contract to protect both parties moving forward.

    jpmom thanked roarah
  • 10 years ago

    The e-mail states quite clearly "deducted off the final project". If this was not done, then I too would have a problem. Many places require a fee up front because so often a customer will have a change of heart and then they've lost money. That is not the case with you and she is now trying to sneak in an extra fee and trying to convince you she's doing you a favor since she has "reduced it" to $1500 for you.

    jpmom thanked ingrid_vc so. CA zone 9
  • 10 years ago

    Ingrid - I agree. It's a sticky situation, b/c if she plays hardball and demands the fee (which I highly doubt she will) - and I walk away - she keeps the $1500.

    I feel confident that we can work something out. But she needs to understand that it is not good business to spring this on a client at the 11th hour. Should I wish to work with her on another project, such as our bathroom etc., then the design fee will be discussed up front. No surprises.

    Since she clearly admitted that this is something they "recently" instituted, it shouldn't apply to current customers. She may argue that "technically" we didn't have a binding contract; however, I gave her the deposit in good faith (my bad, perhaps) and didn't ask for anything in writing to protect me.


  • 10 years ago
    last modified: 10 years ago

    To me this situation is crystal clear: upon request you provided a deposit which was stated would be deducted from the end total. Period. End of story. She cannot change it after she receives it from "deposit" ("for our security") to "design fee." I'm sure this is not legal; it is certainly not ethical.

    jpmom thanked gramarows
  • 10 years ago

    She says this is for "design and project management." It could be that this fee will also cover their services going forward, in which case it might be quite a deal. Ask her to clarify this. Do you have an idea of how many hours she has spent so far? And how many more it will take to complete the project?

    jpmom thanked chibimimi
  • 10 years ago

    She is randomly charging $1500 for something that wasn't discussed up front when the email clearly says that the $1500 would be deducted from the deposit. No way.

    I would tell her absolutely not. If for no other reason than if you accept the $1500 fee now that was just "added on," how many other fees are going to be added on during the actual project just because "we've decided to implement this new fee."

    Once you've done it once, then they'll know you're willing to put up with it.

    jpmom thanked beaglesdoitbetter
  • 10 years ago
    last modified: 10 years ago

    But chibimimi, she said something different previously, that it was a deposit which would be credited back at the end, and that was the agreement under which the OP paid her the agreed upon $1500. You can't (rightly) ask for one thing, then when you get it, change the rules.

    jpmom thanked gramarows
  • 10 years ago

    I think it is unethical of them to do this at this late hour. They should have accepted that your project came along after they instituted the design fee. All in all, $1500 is not a lot of money, and they should have decided that for your project, since you were essentially grandfathered in, they could not, and as professionals, would not, charge you.

    If I were you, I would take the upper hand. Since you like working with them and the project is going well, I would tell them that you are agreeable to the fee, but you expect NO FURTHER surprises along the course of the project.

    In the end, I think $1500 is worthing spending if they are designing and helping to manage the project. It could actually save money in the long run.



    jpmom thanked rockybird
  • 10 years ago

    Your initial story states your project, their involvement, possibly their business offerings has been changing as the project went forward. This reads to me like she is morphing her business model/billing--as the scope of her businesses with you changed. This IMHO would be unfair. She changed the rules part way through the project. In the ensuing time period they realized they are offering design services and should get paid for it. Good for them but seems to me they need to start charging with the client after you and the fee should be stated up front and possibly billed by the hour not just a random $1500, in the future. Where did she come up with that number? She claims "standard" in the industry but in the industry one is perhaps paying for a designer with come credentials, not just a contractor who discovers they have design talent. She was a novice to state the charge this way. If she had been smarter it would have been hidden in a list of charges and your deposit just removed from the end. You can give her credit for being upfront with this new idea she has.

    jpmom thanked arcy_gw
  • 10 years ago

    What missymoo said.

    jpmom thanked User
  • 10 years ago

    How many hours has the designer spent? If it started as just painting cabinets, then grew to be more extensive, then as you say scaled back - how much was it scaled back? In another context- pretend I paid $1500 for a landscape design ( for a full yard with a patio, retaining wall, steps, plantings), and was told that if I hire the designing company to install it that my design fee would be creditted back.... Now if I get the design done and say thank you but I think only want these five shrubs and that tree planted, I wouldn't expect that $1500 to be creditted back against the price of those 6 plants. I'm sorry to hear that you feel like you were taken by this, and clearly the designer didn't communicate how this would be credited back very clearly. It seems to me like you should just talk with them to work it out in a way that is fair to everyone, especially if you enjoy working with them and want to continue. I think the suggestion of counting up the hours and agreeing on an hourly rate seems fair – and if this total comes to us than $1500 then ask for the remainder to be credited off of the installation work they will be doing.

    jpmom thanked engrgirl
  • 10 years ago

    Thank you - all of you, for your support on this. It gives me the confidence to go into my meeting knowing that this is not acceptable.

    Arch this is exactly what has occurred. Their business is growing, and they are taking on larger projects that require a lot of time on their part. Mine was one of the first that required more than just painting the kitchen cabinets. My guess is that they worked on projects where they were soley brought into paint and realized that they could actually handle the entire project, rather than just been a sub.

    I'm really good in situations like this when I don't have a relationship - like over the phone with an airline, cable company - that sort of thing. Or with a clerk at a retail store…. But when I have a relationship with someone, it's not as easy for me to stand up for myself.

    My family has a seasonal business down the shore in NJ - and I'm trying to think of an example to share with her of how doing this isn't ethical. We rent fishing rods - $12/day with a $20 deposit. I guess it would be like keeping the deposit when they brought back the rod saying, "We changed our policy and we now charge $32 for the day — $12 for the rod and $20 for the hassle of renting it to you".

    My husband always says — say what you have a problem with, and then shut up. Let them respond. Even if there is an awkward silence, don't talk.

    I think if I play the "unethical" card, right out of the gate, they will take a step back and rework the final proposal applying the $1500 to the cabinet painting (which is $7,000, btw)


    Missymoo & kswl2 — There is nothing left to add, change, etc. Unless they uncover some sort of issue with regard to removing the backsplash or installing the door glides or painting the cabinets - I can't imagine how they can bury any fees.

    I'll let you know how it goes!

  • 10 years ago
    last modified: 10 years ago

    engrgirl — what was scaled back didn't effect the painting portion. It was the countertops. (we were going to replace our perimeter counters and island, but decided to just do the island) Everything else stayed the same.

    We also were trying to figure out how to replace our 30" cooktop with a 36" cooktop and she said the only way to do that was to modify the lower cabinet. She said We could do this with new counters, but not if we kept the existing. However, when the appliance company came out to measure - they said they could just cut the granite, and center the 36" cooktop over the 30 inch base cabinet. I'm ok with this, so we'll get our 36" cooktop.

    Had I not brought it up to the appliance guys, I'd just be getting another 30" cooktop.

    Just an example of her limited experience - but since we are at the finish line with regard to the plan, I'm good with sticking with them and seeing this through.

    The example you gave really doesn't apply to us - as the $1500 I gave her was never intended to be used for a design fee. The first I heard about this fee was in the most recent and final proposal.

  • 10 years ago
    last modified: 10 years ago

    Did the other work she "designed" consist of the stacked cabinet boxes? Because those didn't work as I recall, and that was due to her inexperience in how to fit a stacked box in that 12" space. My recollection is you're using crown molding instead, and you got that alternate design idea and help on the kitchen forum. Now you say her solution for the cooktop wasn't the correct one either. That would have cost you thousands in a new countertop that you didn't need. If her design solutions don't work or waste money, why should you pay her a design fee? If her only other role was in finding the countertop for you, that's not worthy of a $1500 fee.

    jpmom thanked User
  • 10 years ago

    Hi May! Good to hear from you.

    You are 100% correct. I spent hours here on GW - and with the help of you and others, discovered some great options to fill the upper space without having new cabinet boxes made. I emailed her all of the photos I found and she said they could replicate the examples I found.

    She did spend time coming up with the original plan (using actual cabinets in the space that would have been custom made to match existing) - so they measured, got quotes, etc. And then when I decided against it (b/c it really wouldn't look right) and sent her the examples I found here, she came up with the second plan. She is very new to using a computer design tool - and I'm sure that took her a lot of time to learn; but with all due respect, that's her problem, not mine. I'm certain that she spent a lot of time on my project - but I'm also certain that as she gains more experience she will spend less time as she will have sources she will continually go back to without having to reinvent the wheel each time.

    I'm adament about not paying this fee. Bottom line — It's not what I agreed to and is not good business to add it in now.

    All that being said, I'm excited to start (finally).

  • 10 years ago

    I ran this by my son who's been in the buildings arts for 15 years - thought his take was interesting "it sounds like someone's wife or girlfriend got involved doing this aspect and then realized she needed to get paid too and tagged it on at the end, her mistake- not OK."


    jpmom thanked starnold