Yesterday I discovered that my contractor did not insulate the line from the steam generator to the steam shower. This is about a 30 foot run from the attic above the second floor to the bathroom on the first floor.

Thermasol indicates that the pipe should be insulated if it is over 10 feet OR exposed to cold areas. My contractor is willing to break the drywall to insulate the pipe but he thinks it's unnecessary because the pipe is inside interior walls (I don't think insulated). Should I have him go through the trouble of breaking and patching the drywall to do insulate the line or will it be OK as is?

I live in Los Angeles so the temperature outside rarely gets below the 50's.

Comments (10)

  • 10 years ago

    "OR exposed to cold areas."

    This is a water pipe? Correct?

    If you were in Minnesota, I would be worried. Why would you worry in LA?

  • 10 years ago
    This is the line from the steam generator to the steam head. I think it carries steam rather than water.

    According to Thermasol if the line is greater then 10 feet it should be insulated EVEN IF it is not exposed to cold.

    I have never had a steam generator and don't know exactly how they work but I do know that if things cool too much between the generator and the steam head, I am not going to get steam.

    What I'm trying to figure out is if I really need to insulate this line, as Thermasol advises, or if I'll be OK under the circumstances. I don't think it makes a difference if my house is in Minnesota or LA unless people in Minnesota don't turn their heat on. The interior of my house will be the same as one in Minnesota. Only difference is the couple of feet of pipe in the attic straight from the generator.
  • 10 years ago

    " I don't think it makes a difference if my house is in Minnesota or LA" Well the attic in a home in MN, in winter is probably 20 degrees - way below the freezing point of water.

    "According to Thermasol if the line is greater then 10 feet it should be insulated EVEN IF it is not exposed to cold. "

    Well you have your own answer - Thermasol says it should be. What are you looking for? Someone to tell you it's not so?


  • 10 years ago
    Yeah, I'm asking if it's really necessary to break and patch the drywall under the circumstances. I can easily insulate the portion of the pipe that is exposed in the attic.

    Manufacturers recommendations can be overly anal. I'd love to hear from someone with lots of experience installing steam generators to tell me I really have to insulate or that what I have is totally fine and not worth all the trouble to insulate the line. I can read the manual but I lack the experience to know where I can fudge.
  • PRO
    10 years ago
    last modified: 10 years ago

    Did someone say steam shower installations in Minnesota? Yep we insulate the line. Anal? Yep.

    Just insulated 20+ ft copper for this one.. good to hear you ran it from the attic DOWN...smart

  • 10 years ago

    Insulate it.

  • 10 years ago

    Do want a warranty on the parts? Will he guarantee that he will replace the parts for free if the mfr will not warrant the parts due to the installation instructions not being followed?

  • 9 years ago

    Cutting a section of drywall out, and then patching it up, is a simple exercise. I wouldn't let that aspect of insulating the pipe drive the decision. (Heck, I have a 1920's plaster/lathe walled home, and cutting into/patching even those walls isn't a big deal. Drywall? Wouldn't hesitate.)

  • 9 years ago
    last modified: 9 years ago

    Insulate it with fiberglass with 1" thickness if available and at least a 230-250 °F rating; it is steam. That 30' line equals 1.25 ft^2 of condensing surface. Even if there isn't any back pressure the steam will be at 212 °F and your wall will be ~75°F or a differential of 137°F. That will drive a lot of heat loss. If you are wondering, I design chemical plants for a living.

    I installed my system so that when the unit cooled down and de-energized; a fail open 1/2" ASCO solenoid valve opened to drain the water from the generator's tank. (It looks like the installation by Tundra also has the solenoid valve installed.) The unit would normally be cool about 2 hours after using it. I thought if the generator was not full of water, it would minimize corrosion between uses. Since the tank was empty when not in use I could speed up the heating time by supplying the generator from the hot water line to my Jacuzzi tub. My generator was located on the other side of the wall from the Jacuzzi. All I had to do was flow the water into the tub until it was hot (120°F) versus the winter cold water (55°F). That would save 40% of the heat up time before it would make steam.

    Also try to minimize low point loops in the piping and allow it to self drain to the steam head so that water does not stay in the line.