Software
Houzz Logo Print
greg_rodenhiser

Above ground pool landscaping

8 years ago

We just got a 24 ft above ground pool put in. Our backyard is sloped so one side of the pool is about 18-24 in into the hill and the opposite side is 18-24 in above grade (less than 1/3 of the pool circumference is sitting above grade). The fill extends a good 6-8 feet beyond the pools edge. Installer strongly suggested doing retaining wall or loam (and grass) to spread the slope out. On the flat clear area around the pool going to do crushed stone. In the picture the red arrow shows the fill area. It's above grade form say 8 o'clock to 12 o'clock (going from nothing at 8 peaking at 18-24 inches mid way and back to nothing around 12 (if that makes sense). The slope is a bit exaggerated right now, they left the sod chunks as a temp barrier to help minimize erosion. So in dealing with this slope I have three ideas for solutions:


1.) Do a retaining wall

2.) Do the loam (installer questimated 10 yards should do it)

3.) Do the slope in rip rap or the like to prevent errosion


Any other suggestions? One better than the other? Cost benefits of one over others?



Comments (4)

Sponsored
Peabody Landscape Group
Average rating: 3.5 out of 5 stars8 Reviews
Franklin County's Reliable Landscape Design & Contracting