Electrical was to be re-routed in a Kitchen remodel So that a wall could be opened up. Electrical Permit was issued and inspector came out while electrician was working. The City called the inspection a pre-final. General Contractor says all inspections were done and passed for this remodel. However the electrical tag from the City is still just the permit. The City record shows permit issued, but shows no inspection. Kitchen remodel is completed. We questioned contractor about the electrical and told him the City shows an open prermit. A week ago the Contractor said he will call for a final inspection. We haven't heard from him since. We paid contractor in full. Can the electrical be inspected after the project is completed? All walls and cabinets are installed.