One giant project or multiple small ones?

7 years ago

This is our first attempt at remodeling. We need to do a master bath, kid's bath, and a kitchen.


Our first though was do it all at once. Probably move out of the house for a month, get a whole bunch of people in there, get it all done. Maybe save some money in not paying for a project manager/dumpster/electrician/etc to come in multiple times.


That idea is starting to feel overwhelming though. So many decisions on layouts, material, etc. So many potential gotchas and we have no experience. Maybe doing it one at a time would be the easier way to do it. It might take longer and be a bit more expensive, but it would save on sanity and we can get some experience on the small projects before doing the big ones.


Thoughts?



Comments (3)

  • 7 years ago

    You will be out of the house more than a month. My kitchen alone took seven weeks and we had everything on hand before demo began. Remodeling is very stressful on your budget, your time, your kids, and, especially, your marriage. Why are you rushing? Every detail for each space needs to be carefully designed and planned before you pack up one dish. If you’re first time, talk to your neighbors and friends about the rewards and pitfalls.

  • 7 years ago
    last modified: 7 years ago

    150K-250K worth of project(s) and 6 months isn’t going to see but maybe 3% savings over subs being on site for 1 project and coordinated demolition and disposal. That 3% won’t pay for the alternative housing that would be required by that major scope of work.

    You‘ve been watching too many TV entertainment shows that bear no relationship to real world costs and timelines. It’s all fake.

  • 7 years ago
    last modified: 7 years ago

    I recently completed remodeling my (small) master bath, kitchen, and powder room (also included installing a closet system and some wall reframing in my bedroom so I could have a washer/dryer installed in the walk-in closet).

    The kitchen footprint stayed pretty much the same. A short peninsula was removed and a half wall was extended a few inches to extend a run of counter and cabinets. The sink was moved a couple of inches. The hood vent was also moved about six inches. Otherwise, I kept the flooring and basic layout.

    I was working with a very organized designer and contractor. I originally was going to do this in two phases: master bath/closet along with the powder room and then the kitchen. I had undergone a kitchen remodel in a different home 10 years ago and was dreading the process.

    I decided to just "rip off the bandage" and do it all at once. I did see some savings with both the designer and contractor by doing it all at once but it wasn't a huge amount, as I recall, in the grand scheme of things. Still, every bit counts.

    The entire project was completed in eight weeks. I was fortunate that my family has a weekend property where I could stay during most of the remodeling. It's also just me and my dog and I am retired so I didn't need to worry about upheaval of kids, school, job, etc.

    This is just to give you some perspective from my experience.

    Edited to add: The planning process took at least as long, and probably longer, than the actual construction.