kristenmc12

Vinyl plank floor installation

7 years ago

Hi, I am replacing a sheet vinyl floor in my small kitchen (110 ft sq rectangular space with two stairs to backdoor). For just installation of the planks, not materials, my current contractor (he's will also be putting in new cabinets and a backdoor) quoted me a price of $700 dollars. Does that sound about right to remove some sheet flooring and put in the floating planks and deal with two stairs? We are in a Chicago suburb, but this seems to be higher than averages online. Thanks for all your help and expertise!

Comments (5)

  • 7 years ago

    In a more expensive market, you can expect to see costs that reflect that. He's quoting you for removal AND disposal (I'm assuming) as well as preparing the substrate for the new vinyl.


    In my neck of the woods (Vancouver BC Canada = very expensive) here is what I would expect to pay:


    Removal + Disposal: $1.50 - $2.50/sf

    Subfloor preparation: $1/sf (labour only) + $1/sf (materials only)

    Installation of Vinyl floating floor: $2.50 - $3.50/sf (small space price = more)


    If my math is correct, that gives you a price tag of $6 - $8 per square foot. And yes, vinyl planks cost more for labour than laminate. Vinyl is tricky and takes patience.


    Because your job involves OTHER THINGS I'm going to guess part of his flooring estimate also includes demolition/preparation for new cabinets, etc. A GOOD contractor will KNOW that EVERYTHING needs preparation and not just 'installation'.

    kristenmc12 thanked SJ McCarthy
  • 7 years ago

    Thanks, SJ! All good to know. To clarify, this quote is just for the flooring, not cabinet removal or prep, etc. because that's already been accounted for in a separate and detailed bill, so I know I am already paying for that. This is separate job (that may or may not happen, depending on cost, of course), and I'll be purchasing ALL the materials, so the quote is for removal/disposal of a portion of vinyl sheet floor and the prep and installation of vinyl planks on floor and 2 three-foot stairs. Contractor said floor will go in after new cabinets, and will go up to them, but not under them. He doesn't want to do anything until cabinets are in. I wasn't going to get any other bids, since he's already in the process of doing the other work and its going OK. I just wanted to make sure the quote wasn't too high. It is more than I am seeing for similar projects, but theres no mentions of stairs, so perhaps that's where the extra comes in. Thanks for the rundown!

  • 7 years ago

    Actually, after checking with the contractor, the installation quote does NOT include demo and removal of the old floor, just putting in planks on floor and stairs. Says substrate isn't necessary in this case. Price is coming out to $7 a foot for just that. Does price per foot not really work with small kitchens?

  • 7 years ago

    I would ask why such a steep price for installation. Ask which order the kitchen will be put back together. A small room installation cost could work out because they use a "day" wage for small projects. I've heard of minimum charges of 1/2 day of work or 1 full day of work regardless of how long it takes.


    But I'm suspicious of this because the installer has MANY other things going on (or so I believe by your post). A person who is redoing someone's kitchen will often give a little so they can gain the entire project.


    The small space install only works if the ONLY THING s/he's doing is installing. And I never buy the 'nothing else needs doing' jazz. A sheet vinyl floor can have some WONKY substrates underneath (can look like a roller coaster ride). Sheet materials are VERY forgiving. A plank vinyl is NOT forgiving...at all. In fact, a poorly prepared substrate is GUARANTEED to void your warranty. And I mean 99.3% of the time the lack of prep is going to void your warranty IMMEDIATELY (before he leaves for home).


    I think you have some conversations coming up in the next few days. And to be clear for us, is this the SAME person who is doing the ENTIRE renovation?

  • 7 years ago

    Thanks, SJ. You have been an amazing source of info. The one contractor is doing ALL the other work: floor goes in after cabinet install but before appliance hookup. He ended up offering to come down a bit in price or add in demo and removal of the old floor after my questions yesterday (big thanks to you). Will ask again about substrate because the warranty is paramount. Thanks again!