Software
Houzz Logo Print
killwhat

Help with walkway base material

6 years ago
last modified: 6 years ago

I'm taking on redoing the walkway to our front steps. I've excavated the base about 12" deep along the length of the walkway, which is about 50 feet. Right now, I can decide on what type of material to use for the finish layer. Leaning towards porcelain pavers with pebbles in between, but not 100% sure. And I'm precious wasting time before cold weather rolls around.


I'm thinking of tackling the setting bed before the cold weather comes around in Massachusetts so we don't end up with a moat all winter. If it stays like this all winter, it will help with the settling of the foundation material.

Does the setting bed material vary much based on the final layer choice? Is it safe to install Quarry Process stone (3/4 crushed stone + stone dust) as the base layer if I don't know exactly what the final layer will be?

Comments (2)