block foundation for slab not lined up

4 years ago

My husband and I have started building our custom home and this is a a picture of the block foundation for our slab. The little cove will be where our front door is. Is there a reason the blocks don't line up and are recessed about 2"? I'm not a builder but this doesn't seem right to me. Were they off in measurements and had to readjust? Will this create problems further down the road?

Comments (15)

  • PRO
    4 years ago

    Ask the person that laid the block.

  • 4 years ago

    They don't speak English

  • PRO
    4 years ago

    ¿Qué idioma hablan ellos?

  • 4 years ago

    Ask your GC.


  • 4 years ago

    That is one of the worst block jobs I’ve ever seen. I know most of it will be below grade where you can hide ugly, but I’d question the stability of those walls. Not too late for a do-over.

  • 4 years ago

    Goodness gracious. That is called a haunch. Your concrete porch stoop will sit on top of it. It will prevent your stoop from ever settling. Thank your designer.

  • PRO
    4 years ago

    Any caps on that rebar?

  • PRO
    4 years ago

    What country are you building in?

  • 4 years ago

    It looks like they ran a few courses up, then figured out they weren't building to the correct dimensions. They then scabbed on some 4" block to make it up, then kept adding courses to the correct dimension. Does it freeze where you live? Have them add mortar to seal off those open cells to keep water from working into block and freezing. Is the block sitting in the flooring?

  • 4 years ago

    Again, much ado about nothing here.

    - A CMU foundation wall typically consists of 8" wide units. A good detail is to use 10" or 12" wide CMU units on a lower course to create a haunch that sticks out, which supports a slab and prevents settlement of that slab.

    - The messiness of the cell fill in the CMU is not of concern - it will be covered by the slab. The cell fill is required where vertical rebar is located.

    - The messiness of the joint work is what you get when it won't be exposed or will be covered with another finish. Unless specified otherwise, you get what you get in construction.

    - The top course of CMU has been purposefully cut to allow a continuous slab connection with the wall and rebar. Here is an example of a prefab unit for that detail:



    Backing up a bit, this wall appears to be necessary for a slight slope for a slab-on-grade foundation, or something of that nature. If so, instead of a monolithic pour with an integral foundation wall (which can bring other difficulties), they chose CMU separate from the slab.

    - Rebar caps are a safety consideration for OSHA compliance.

  • 4 years ago

    I’m glad I live where they have more pride in their workmanship. Just because you can cover it up doesn’t make it right or durable.

  • 4 years ago

    Where on earth you live has nothing to do with the quality of a job. It is an individual's personal level of OCD, their level of investment and care of a stranger's project, and whether mother nature or a boss is breathing down their neck for speed.

    Construction of a building has many layers of processes and systems that are behind the scenes from what the user ultimately ends up seeing. For most people seeing this process transform is eye awakening. That same feeling may occur if they saw where their hosts at a party stuffed all the junk in a closet to clean up, the backhouse of a tv studio set, or the internal stitches and arrangement of organs that the surgeon placed back in a body.

  • 4 years ago

    Sorry, 3. I’ve been on thousands of job sites and have never seen a mess like this. You might think it’s fine, I don’t.

  • 4 years ago

    Good thing we don't all see how hot dogs are created. (Or head cheese!)


    Trimmings destined for your hot dog bun.

  • 4 years ago

    "I’m glad I live where they have more pride in their workmanship."

    Julie, you are insinuating that where you live (planet, country, state, city, or house?) is the determination in the level of workmanship, but not money, job conditions, workforce, supervision, specification, or 20 other more important factors. Apparently, your corner of Minnesota is nirvana. A handful of forum commenters like to weave in cultural hot topics here and there, or rather I should say can't separate themselves from them.

    Instead, if you know your stuff and don't like what you see, you will recommend to the OP what is wrong, why it is wrong, and how to fix it.