Search results for "Prestige" in Home Design Ideas

The 3M™ Prestige70 was a perfect choice for this home with it's virtually clear films that address both fade and heat concerns!
Beach style living room photo in Bridgeport
Beach style living room photo in Bridgeport
Find the right local pro for your project

Prestige Mills style Templeton fabricated into a custom area rug for a playroom.
Minimalist kids' room photo in New York
Minimalist kids' room photo in New York

The window pane on the left shows the view to the backyard WITH Prestige film installed. The right side is without film. Notice the difference? Prestige enhances your view by blocking out the glare. It also blocks 50%+ of the heat coming into your home.

Providing comfort and energy savings, the 3M™ Prestige70 window film is an ideal sun control film for homeowners that do not want to change the aesthetics of their windows.

Example of a beach style formal dark wood floor living room design in Orange County with beige walls, a standard fireplace and no tv

Prestige Mills style Templeton fabricated into a custom area rug for a playroom.
Kids' room - modern kids' room idea in New York
Kids' room - modern kids' room idea in New York

Providing comfort and energy savings, the Prestige60 window film is an ideal sun control film for homeowners that do not want to change the aesthetics of their windows. The prestige series is designed to be virtually clear with all the benefits of a dark film. Prestige films reject heat to increase home comfort and adding fade protection to their valuables. Not only will this home owner have lower energy bills, but they will have a cooler home in the summer time months.

Prestige Mills carpet - Clarence Stripe.
Photo credit Terry Pommett
Example of a mid-sized beach style wooden l-shaped wood railing staircase design in Boston with painted risers
Example of a mid-sized beach style wooden l-shaped wood railing staircase design in Boston with painted risers

Prestige Mills style Templeton fabricated into a custom area rug for a playroom.
Kids' room - modern kids' room idea in New York
Kids' room - modern kids' room idea in New York

Gazebo and hot tub combo from Catalina Spas, courtesy of Prestige Pools and Spas in St. Louis, MO.
Inspiration for a backyard deck remodel in St Louis
Inspiration for a backyard deck remodel in St Louis
6









