While at first Chris was on top of things for our new custom. He was meticulous in every detail, started work without money in his hands. We had nothing but rave reviews. House was going up quickly; he caught inconsistency in plans, and had great design ideas for the house. He just about checkout 2 two months before we move in. He came late to meet subs on the job or didn’t even show up at all and left it to us. We discovered shoty tile jobs and other items that should have been caught on his supervision. While he has fixed them, the new material was from our costs. He was unable to produce receipts for overages on communicated allowances and ignore punch list items before moving in. He did shotty work on items that he didn’t have the full scope. We had issue upon issue after moving in; incorrect 220V outlet, bathtubs not draining, in operational AC, and smoking from our gas fire place. All addressed some in a not so timely manner. He assures this were all typical items of a new build, while I can say we didn’t have any of them with a spec home. His lack of recent custom homes and not knowing the county required a fountain inspection, lead to our foundation not being built to code and me having to run numbers as an engineer to provide to code official to pass foundation inspection. The 4” CMU was at the upper bounds on capacity and not spec’d out on the originally contract drawings or the contractual sheet (8”) he provided.