Software
Houzz Logo Print
lastateofmnd

Sub-contractor expectations & scheduling

12 years ago
I'm trying to be my own general contractor(mine quit on me). After demo I rewired and had the electrical done as well as HVAC but what order do I plan the rest of the subcontractors for a whole house remodel?? what is the scope of a plumbers job in this case? Do they install bathtubs, fixtures and toilets or just place water lines? Who's jurisdiction is moving a gas line a few feet??

Comments (4)

  • PRO
    12 years ago
    Gas line is going to be tricky. You can get some help by contacting your gas company. They should be able to tell you which trade will deal with that.

    Plumbers can/should do the piping and the install of the fixtures. They will need physical help (bath tubs are heavy) but they should be the one's putting in the fixtures.

    You may want to contact another GC to see if they can help with the overseeing of your project. In Canada, when the homeowner is the GC everything falls into their lap - legally. That means all permits, all code/code violations EVERYTHING. I would be very quick to find someone who will help you orchestrate the rest of your project. You will have to be very specific about legalities if you choose to bring in a GC who is willing to 'supervise' you.

    I'm not sure what your technical/mechanical background is when it comes to building trades. Chatting with some of your subcontractors will help. They will say things like, "Once X is done, I come in and do Y". By working backwards you will find out what comes first.

    Some "finishing" details (I'll use flooring as the example) will change the order of construction. Example: a glue/nail/staple/mortar in place floor comes BEFORE the kitchen is installed. A floating floor (laminate, bamboo, cork, etc) means the flooring gets put in AFTER the kitchen is installed.

    You see where the "finish" will influence the order of installation.
  • PRO
    12 years ago
    Maybe hire a project manager to assist with the hiring of trade contractor, building permits and estimate/bid reviews. Here is a link to a white paper regarding hiring an electrical sub-contractor and most everything applies: http://www.clearled.biz/uploads/Electrical_Contractor_Selection.pdf
  • 11 years ago
    Can you tell me the difference between a project manager and a general contractor?
  • PRO
    11 years ago

    A general contractor is often the owner of the company. Though he may manage a project, he may also have a company structure wherein he or she as the general contractor meets potential clients, estimates the job and then passes over the production of said job to a 'project manager'. A company may have 2 or more project managers who each oversee several jobs at once. In some ways project managers and general contractors are one in the same. Essentially, both roles oversee budget management, scheduling, partnering with trade subcontractors (plumbers, electricians, etc.) quality control, etc.

    Another way to understand it is that general contractors are the umbrella under which we partner, manage and oversee subcontracting trades.

    EVERY company is very different in how they are structured. Hope this helps!