Updating a dated kitchen without starting over.

12 years ago
It wasn't in my budget to gut this kitchen and start over so I worked with what I had as much as possible. At the same time I was also having hardwood floors installed throughout the first level of my townhome so it made sense to rip up the tile from the kitchen and remove the awkward island while we were at it. A few extra unfinished cabinets were ordered to form a new peninsula to home the new (but still Jennair downdraft) stove and to enlarge the cabinets over that side of the kitchen. Cabinet doors were re-used for the new upper cabinets from the old island. Crown molding was added to the upper cabinets and a new breakfast bar was created.

The cabinets are painted Benjamin Moore Cream Fleece.
The wall color is Benjamin Moore Crisp Khaki.
The granite is Coast Green which I got for a *fantastic* price from Mass Granite & Marble in Acton, MA. The paint colors were selected based on the granite.
The backsplash is marble from Forever Tile in West Concord, MA. The contractor had a beast of a time installing it and told me after that if I wasn't so nice, he would've walked off the job. It's a beautiful jigsaw puzzle with many delicate, broken pieces needed to be cut out and replaced.
Glass knobs are Amerock.
Wood floors are finished with Minwax Provincial.
The window treatments are custom made by Artee Fabrics in Hudson, MA, the damask pattern is from Unique Fabrics.
The pendant lights are JVI Designs.

I *love* the way it turned out though I had many challenges with contractors, especially the painter that did the cabinets. They will need to be repainted sooner than later. The entire project took much longer than I anticipated.

Comments (15)

  • 12 years ago
    More pics.
  • 12 years ago
    You must be thrilled absolutely gorgeous! Did you prime and paint w a latex?
    Rachel H thanked susangmt
  • 12 years ago
    Lovely and the tiler did a fantastic job on the backslash.
    Rachel H thanked debiemahoney
  • 12 years ago
    I like the tile job too, nice kitchen
    Rachel H thanked Judy Payne
  • 12 years ago
    Hi susangmt - the painter used Benjamin Moore ADVANCE Waterborne Interior Alkyd Paint on the cabinets - I just checked a leftover can, and I do believe he primed. I can't say that he painted the cabinets in a recommended way because I don't know these things (I think he used the right paint, I don't think he prepped the cabinets in any way); all the work this person did in my home seemed pretty half-ass and needed to be touched up or will need to be redone some day. It looks beautiful as long as I don't show you where it's not. ;-)

    As for the tile - I was sure I wanted something with more color but I kept getting drawn back to this tile which I believe is crema marfil marble. I am absolutely in love with it. Here's a new pic with more accurate color than the one above.

    Thank you all!
  • 12 years ago
    What an inspiration! Thanks for sharing.
    Rachel H thanked losthorizonlisa
  • 12 years ago
    Wow! Your kitchen looks great! Way to go easy on the budget.
    Rachel H thanked natrillyme
  • 12 years ago
    What a great idea to get rid of island peninsula so much more functional in the space. Your window treatments are stunning!! I love them.
    Rachel H thanked jck910
  • 12 years ago
    last modified: 12 years ago
    I forgot one of the final touches - an antique floor lamp with Cape Cod nautical map shade for the reading corner ...
  • 10 years ago
    I have an island downdraft that I would love to move... How long did it take the contractors to move your range?
  • PRO
    10 years ago

    Way to go. Great work.

    Rachel H thanked Hamilton Klow Architects
  • 10 years ago

    Hi vanny61, this whole project took forever. We took the island out
    before the wood floors were put in the entire first floor of my home so
    the new flooring covered over the old holes. Then it was a long wait
    for the new cabinetry for the new peninsula. I think the contractor
    cut the new hole in the wrong location first for the downdraft, which
    was luckily easy to access in my unfinished basement. Plumber needed to
    hook up the gas, permit needed. The timing for me could be totally different for you depending on what else you'll need to do in order move yours and how many people you've got working on the project, how accessible your draft and hookups are, etc.