So I have the plans from my LA and need to find an installer. The LA recommended 3 people he works with regularily.

#1 - could not bother to look at the site - only used the drawing. Got the size of steps completely wrong on the quote - drawing is to scale and size was confirmed by email.

#2 - did not read the drawing correctly, did not read the request for extra flag stone correctly. Quoted the wrong stone for the natural stone steps.

#3 - have not heard from him even though he promised quote last week.

Two quotes for same patio - $10,500 vs $16,000. For the same natural steps - $4,100 vs $2,300. Of course the one with the lower price on steps is the higher price of patio.

So many trades people just don't seem to care any more. This past year alone: hired someone to caulk windows - did not bring enough caulking to finish the job and never returned - also did not send me a bill. Hired a company to install a sun room - to be complete by May 2006 - finished Dec 2006 and still waiting to have them fix a leak.

Comments (7)

  • 19 years ago

    That is a great argument for DIY.

  • 19 years ago

    I think Andrew (Rabbi laag) has answered this question definitively elsewhere perhaps you can do a search or someone knows where it is.

  • 19 years ago

    How did you know that I grew a beard?

  • 19 years ago

    Turn this way. See, there you are, Smile. courtesy GWB.

  • 19 years ago

    madtripper, skip all three and find three more to give estimates. Just because we have three estimates, doesn't mean we have to stop looking! When you find the right one, your guts will tell you.

    I got a couple estimates last fall for taking out a tree, same tree, one was a thousand, one was 700. I actually chose the guy for a grand, it felt right to me. He never showed up. The other guy was a real condesending jerk, so wasn't calling him back anyway. Ended up getting friends of my ex's to cut it down for 200...and got a broken window out of the deal, but hey, the tree is gone :D

    My guts? they told me to get out the yellow pages and start over. I didn't listen, and the only damage was the broken window and lack of being able to use the tree for mulch.

    Good luck!

  • 19 years ago

    I had problems getting a contractor hooked up sometimes. Is there an element of the plan that is something the contractors seldom do? For me it was always concrete.

    Oh, I could get one of the three locals to come do a sidewalk. But most of the work I needed done required forming. Any of them could do the work, they just didn't want the job.

    It wasn't price. Concrete was seldom more than 1% of the $2+ million I spent each year. I told them charge what you want, any way you want. I guarantee you make a profit.

    Maybe it is a little different, but I promise to be on the job to answer any questions. I will check all forms before pour for size and grade. If it comes out wrong, I'll tear it out and pay you to build it again.

    Two months later I'm still going from one to another, begging for a crew. In a few cases, I never did get a crew. No choice but get unskilled labor and do it myself.

    So if you can't get a contractor, there is something that they see as trouble. Go over the plans.

  • 19 years ago

    As stated, if you get 3 bids and none feel right or look right ... get 3 more. I did a house design and worked w/ my client's builder (client got the bids and picked the builder), what a clown job the whole project turned out to be.

    Builder couldn't read a set of plans if he had on glasses and someone to explain the drawings to him. Found out the builder was a only a framer and never did hire out as the general contractor to build a complete house.

    Framer for 10 yrs does not make you a qualified general contractor but that's what he claimed he was. 13 cmonths to build the house when it should have taken no more than 8 months.

    Always get references and inspect several porjects they have done. If the past clients won't recommend that "builder" then move on to the next.

    If the builder doesn't give references they're not worth hiring.

    Make sure you hold back a 10 - 15% piece of the payment until everything is done to your satisfaction. Once satisfied then make the final payment.