Software
Houzz Logo Print
linnea2

On coffee can engineering and dry mix edging

20 years ago

I've had an excavator here about a month ago, cutting level paths with trenches

on each side. All the trenches (500') get flexible 2" pipe in them before the

dry mix. Most of these I'm running (removeable) water hoses through,

terminating in dry mix "pads", each holding a tire pot for coiling it in

when not in use. The link shows one of them, finished today.

I posted another picture in the gallery, that shows a tunnel under last year's

dry mix edge. It's rock solid! So I got my "test".

Sooo, welding, mega balls, reclining ladies are all in the waiting room

until this gets done. We had to sod the paths first, and water it all day

for weeks with no rain.

Water comes first, I've done a lot of planting too.

I'm checking the forum regularly, so I know what you're all up to.

Just letting you know what's cooking.

Have a great summer Gang!

Here is a link that might be useful:

Comments (4)

Sponsored