Software
Houzz Logo Print
amaretto_gw

Getting the bottom of the rock

19 years ago

Hello, all

I'm getting set to create a few hypertufa rocks for my landscaping edge.

I've created a few molds using chickenwire and plastic bags filled with newspaper. I should start the tufa mixing tomorrow.

My plan is to get the upper sides of the rock, wait about 20 hours, do a bit of wire-brushing, then flip over and do the bottoms.

Having never done this, my concern is will the tufa placed 20 hours later bond with the existing tufa?

Well, I admit I'm also concerned about roaches attracted to the wet newspaper LOL

Comments (3)

Sponsored
Hope Restoration & General Contracting
Average rating: 4.7 out of 5 stars35 Reviews
Columbus Design-Build, Kitchen & Bath Remodeling, Historic Renovations